N-1-(iv)
Exhibits
12/12/2025
Appendix I - Completed Transmission Line Replacement and Upgrade Projects - Excel
N-1-(iv).xlsx · XLSX · 105.1 KB
The AI overview for this document is being prepared.
Filed in: M12619 — Nova Scotia Power Inc. - 2026 Annual Capital Expenditure (ACE) Plan - $284 million
Preview isn’t available for this file type — use Download original above to view it.