100691 Other documents 01/23/2026

NSEB (NSPI) IR 1 to 202 - Word

Download original
100691.docx · DOCX · 117.1 KB
AI overviewWhat this document contains

This document is a non-confidential information request from the Nova Scotia Energy Board to Nova Scotia Power Inc. regarding the 2026 Annual Capital Expenditure (ACE) Plan of $284 million. It covers a wide range of topics including capital investment plans, changes in expected expenditures, assumptions regarding external funding and depreciation rates, clarification on specific infrastructure projects, budget variances, project timelines, reliability improvements, and various technical and procedural questions related to capital projects, infrastructure replacements, vegetation management, and regulatory compliance.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12619 — Nova Scotia Power Inc. - 2026 Annual Capital Expenditure (ACE) Plan - $284 million

Preview isn’t available for this file type — use Download original above to view it.