N-22 Exhibits 05/08/2026

RIRs filed from M12768 - NSPI (BW) RIR 1 to 10 - (Filed as N-2 in Matter M12768) - Redacted

Download original
N-22.pdf · PDF · 967.8 KB · 17 pages
AI overviewWhat this document contains

This document is an exhibit (Exhibit N-22) filed in Matter M12768, containing responses from Nova Scotia Power Inc. (NSPI) to information requests regarding the ELIADC Tariff 2025 Annual Report. It covers topics including adjustments to PHP's bill based on the 2025 ELIADC Tariff results, the impact of a cyber incident on data systems and scheduling processes, the use of PLEXOS for load scheduling, and the handling of cause codes and dispatch processes for PHP.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12661 — Nova Scotia Power - Application for approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (PHP)Application for approval of the Extra Large Industrial Dispatchable (ELID) Tariff, an above-the-line- tariff available to Port Hawkesbury Paper

17 pages
100%