N-25 Exhibits 05/08/2026

Evidence - IG

Download original
N-25.pdf · PDF · 695.4 KB · 28 pages
AI overviewWhat this document contains

This document is a pre-filed testimony submitted by Bowman Economic Consulting Inc. on behalf of the Industrial Group in Matter M12661 before the Nova Scotia Energy Board. It covers the evaluation of Nova Scotia Power's proposed Extra Large Industrial Demand (ELID) Tariff, including critiques of the rate structure, cost-of-service calculations, dispatchability mechanisms, and credit allocations, as well as recommendations for adjustments and transparency measures.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12661 — Nova Scotia Power - Application for approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (PHP)Application for approval of the Extra Large Industrial Dispatchable (ELID) Tariff, an above-the-line- tariff available to Port Hawkesbury Paper

28 pages
100%