N-28 Exhibits 06/18/2026

IG (PHP) RIR 1 to 8

Download original
N-28.pdf · PDF · 124.2 KB · 17 pages
AI overviewWhat this document contains

This document is an exhibit (N-28) from an information request (RIR) filed in a Nova Scotia Energy Board regulatory matter. It contains summaries of responses and discussions related to Nova Scotia Power Incorporated's application for an Extra Large Industrial Dispatchable Above-the-Line Tariff for Port Hawkesbury Paper, including topics such as cost allocations, demand response credits, interruptibility, capacity value, and energy consumption impacts.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12661 — Nova Scotia Power - Application for approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (PHP)Application for approval of the Extra Large Industrial Dispatchable (ELID) Tariff, an above-the-line- tariff available to Port Hawkesbury Paper

17 pages
100%