N-35 Exhibits 06/22/2026

Synapse (PHP) RIR 1 to 3

Download original
N-35.pdf · PDF · 111.0 KB · 5 pages
AI overviewWhat this document contains

This document is an exhibit filed as part of an RIR batch in a Nova Scotia Energy Board regulatory matter. It contains a response to an information request regarding the impact of Port Hawkesbury Paper's interruptible load on transmission costs, compensation mechanisms for interruptible load, and analyses related to the Extra Large Industrial Dispatchable Above-the-Line Tariff application by Nova Scotia Power Incorporated.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12661 — Nova Scotia Power - Application for approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (PHP)Application for approval of the Extra Large Industrial Dispatchable (ELID) Tariff, an above-the-line- tariff available to Port Hawkesbury Paper

Filing event: RIR on 06/22/2026 · View digest →

5 pages
100%