101220 Other documents 03/12/2026

NSPI (PHP) IR 1 to 13 - PDF - Redacted

Download original
101220.pdf · PDF · 799.6 KB · 15 pages
AI overviewWhat this document contains

This document is an intervenor response (IR) filed in a Nova Scotia Energy Board (NSEB) regulatory matter. It contains PHP's detailed responses and concerns regarding NS Power's application for approval of the ELID Tariff, including issues related to load forecasts, interruptible load credits, revenue-to-cost ratios, transmission costs, and the impact of reduced demand on cost reallocations. The document also includes financial data, requests for clarifications, and references to specific incidents and tariff mechanisms.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12661 — Nova Scotia Power - Application for approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (PHP)Application for approval of the Extra Large Industrial Dispatchable (ELID) Tariff, an above-the-line- tariff available to Port Hawkesbury Paper

15 pages
100%