101226 Other documents 03/12/2026

PHP (NSPI) IR 1 to 6 - PDF

Download original
101226.pdf · PDF · 325.1 KB · 8 pages
AI overviewWhat this document contains

This document is an exhibit filed in a Nova Scotia Energy Board regulatory matter, containing a series of questions and requests for information related to Nova Scotia Power Inc.'s application for an Extra Large Industrial Dispatchable Above-the-Line Tariff for Port Hawkesbury Paper. Topics covered include the methodology for determining PHP coincident peaks, cost of service studies, demand-related cost allocation, securitization deferral account costs, interruptible credits, and the impact of these factors on energy and demand charges for 2026 and 2027.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12661 — Nova Scotia Power - Application for approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (PHP)Application for approval of the Extra Large Industrial Dispatchable (ELID) Tariff, an above-the-line- tariff available to Port Hawkesbury Paper

8 pages
100%