20260922-1 transcripts 09/22/2026

Hearing Transcript — 09/22/2026 (MICHAEL WILLETT, ERIC FERGUSON, CRAIG MOWATT, DAVID STANFORD, MICHAEL GORMAN, COLIN FITZHENRY)

Download original
20260922-1.pdf · FILE · 1.1 MB · 327 pages
AI overviewWhat this document contains

This document is a hearing transcript from a Nova Scotia Energy Board regulatory matter, containing testimony and discussion related to Nova Scotia Power Inc.'s application for approval of an Extra Large Industrial Dispatchable Above-the-Line Tariff for Port Hawkesbury Paper. Topics covered include compliance with renewable energy certificate requirements, load-shifting benefits, demand and energy cost reconciliation, dispatch instructions, demand determinant calculations, cost-of-service models, interruptible credit calculations, and the impact of tariff design on customer load and cost allocation.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12661 — Nova Scotia Power - Application for approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (PHP)

Filing event: APPLICATION on 09/22/2026 · View digest →

327 pages
100%
⬇