CA (NSPML) IR 1 to 4 - Word
101309.docx · DOCX · 28.3 KB
AI overviewWhat this document contains
This document is an intervenor response (IR) filed in Matter M11009 before the Nova Scotia Utility and Review Board. It contains requests for detailed data and clarification regarding the holdback mechanism, NSPML's compliance with a 2023 Board Decision, explanations for under delivery, calculations of holdback amounts, analysis of LIL outages, and justification for an additional $1.1 million in WACC consideration.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M12696 — NSP Maritime Link Inc. (NSPML) - Application to Review the Holdback Mechanism
Preview isn’t available for this file type — use Download original above to view it.