101195 Other documents 03/11/2026

2025 Q4 Capital Reports

Download original
101195.pdf · PDF · 6.2 MB · 23 pages
AI overviewWhat this document contains

This document is an exhibit filed as part of an application batch in a Nova Scotia Energy Board regulatory matter. It contains detailed capital expenditure reports for NS Power covering the fourth quarter of 2025, including spending under the 2025 ACE Plan and other capital projects across Generation, Distribution, Transmission, and General Property categories. It also outlines the status, functional classes, spending figures, and approval details of top 10 projects initiated prior to 2025 that are not included in the 2025 ACE Plan, as well as unapproved capital projects above specified thresholds.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12719 — Nova Scotia Power Inc. - CI C0059483 – 83V L-5017 and L-5046 Rebuild Tap - $1,558,116

Filing event: APPLICATION on 03/11/2026

23 pages
100%