Board letter re: report and directing for application to be filed
104078.pdf · PDF · 264.3 KB · 2 pages
AI overviewWhat this document contains
This document is an exhibit from a Nova Scotia Energy Board regulatory matter. It contains a letter from the Board directing Nova Scotia Power Incorporated to update its distribution hosting capacity table, address concerns about network upgrade refunds, and file a cost allocation regulation application by December 31, 2026, following the submission of its second annual report on interconnection processes.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M12778 — Nova Scotia Power Inc. - Annual Interconnection Processes Proceeding Report
Filing event: APPLICATION on 10/23/2026 · View digest →