103309 Other documents 08/24/2026

Letter from NSPI re directives reporting

Download original
103309.pdf · PDF · 116.2 KB · 3 pages
AI overviewWhat this document contains

This exhibit contains a letter from NSPI regarding directives reporting. It covers NS Power's submission of its second Annual Interconnection Process Proceeding Report, the NSEB's findings and directives, the restoration of hosting capacity map activity, the development of new distribution system models, and a regulatory review by NS Power.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12778 — Nova Scotia Power Inc. - Annual Interconnection Processes Proceeding Report

Filing event: APPLICATION on 08/24/2026 · View digest →