101644 Other documents 04/20/2026

Hearing Order

Download original
101644.pdf · PDF · 199.7 KB · 3 pages
AI overviewWhat this document contains

This document is an exhibit filed in a Nova Scotia Energy Board regulatory matter. It contains a Hearing Order related to the Berwick Electric Commission's application for a $6,000,000 Capital Work Order to refurbish the Factorydale Hydropower Plant, including procedural details such as the conduct of a paper hearing, deadlines for interventions and submissions, and references to applicable regulatory rules.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12795 — Town of Berwick Electric Commission - Factorydale Hydropower Plant Refurbishment - $6,000,000

3 pages
100%