B-1-(iii) Exhibits 04/08/2026

Appendix 3 - HSV-2024-043-SREP02 Feasibility Study

Download original
B-1-(iii).pdf · PDF · 3.8 MB · 59 pages
AI overviewWhat this document contains

This document is an exhibit filed in a Nova Scotia Energy Board regulatory matter. It contains technical and financial information related to the refurbishment of the Factorydale Hydropower Plant, including equipment details, project impacts, funding opportunities, and analysis of various refurbishment options.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12795 — Town of Berwick Electric Commission - Factorydale Hydropower Plant Refurbishment - $6,000,000

59 pages
100%