N-6 Exhibits 07/07/2026

NSPI (SNS) RIR 1 to 7

Download original
N-6.pdf · PDF · 340.1 KB · 11 pages
AI overviewWhat this document contains

This document is an exhibit from a RIR batch filed with the Nova Scotia Energy Board. It contains responses from Nova Scotia Power Inc. to requests regarding its 2026 Load Forecast, including explanations of electrification assumptions, infrastructure requirements for higher penetration of flexible loads, and discussions on avoided cost series for demand-side management, strategic electrification, and the impact of federal incentives and programs on load forecasts.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12861 — Nova Scotia Power Inc. (NSPI) - 2026 Load Forecast Report

Filing event: RIR on 07/07/2026 · View digest →

11 pages
100%