N-3 Exhibits 09/03/2026

NSPI (NSEB) RIRs 2-6

Download original
N-3.pdf · PDF · 167.9 KB · 5 pages
AI overviewWhat this document contains

This document is an exhibit filed in a Nova Scotia Energy Board regulatory matter, containing responses to information requests (IRs) related to design specification interpretation issues, system defects, and integration requirements during the implementation of a project involving energy management systems at Tufts Cove and Wreck Cove. Topics covered include a critical defect in the system's calculation of daily maximum energy, verbal communication regarding defect remediation, and requirements for integrating daily maximum energy targets from NSPI Marketing.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12919 — Nova Scotia Power Dispatch Study Action Plan – Quarterly Update – Q2 2026

Filing event: RIR on 09/03/2026 · View digest →

5 pages
100%