N-4-(i) Exhibits 09/14/2026

NSPI (CA) RIR-13 Attachment 1 - Excel

Download original
N-4-(i).xlsx · XLSX · 273.9 KB

The AI overview for this document is being prepared.

Filed in: M12932 — Nova Scotia Power Inc. (NSPI) - Time-Varying Pricing Pilot Program - 2024/25 (Year Four) and 2025/26 (Year Five) Evaluation Reports

Preview isn’t available for this file type — use Download original above to view it.