N-2 Exhibits 09/17/2026

NSPI (NSEB) RIR 1 to 9 - Redacted

Download original
N-2.pdf · PDF · 983.5 KB · 24 pages
AI overviewWhat this document contains

This document is an exhibit filed in response to information requests (IR) from the Nova Scotia Energy Board (NSEB) under matter M12962, relating to the TRE5 IP-LP Turbine Refurbishment project. It contains NSPI's responses covering turbine component refurbishment details, inspection results, cost variances, operational considerations, and the projected operational life of the Trenton Unit 5, including its role in maintaining system reliability through 2029/2030.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12962 — Nova Scotia Power Inc. - CI C0068659 – TRE5 – IP-LP Turbine Refurbishment - $2,963,160 (ATO)

Filing event: RIR on 09/17/2026 · View digest →

24 pages
100%
⬇