103350 Other documents 08/26/2026

NSEB (NSPI) IR-1 to IR-9

Download original
103350.pdf · PDF · 175.4 KB · 4 pages
AI overviewWhat this document contains

This document is an exhibit filed in a Nova Scotia Energy Board regulatory matter and contains a series of information requests (IR-1 to IR-9) issued by the NSEB to Nova Scotia Power Inc. regarding the TRE5 IP-LP Turbine Refurbishment project, including details on project costs, inspection records, retirement plans, asset risk profiles, defects identified in Trenton Unit 5, and cost variances.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12962 — Nova Scotia Power Inc. - CI C0068659 – TRE5 – IP-LP Turbine Refurbishment - $2,963,160 (ATO)

Filing event: APPLICATION on 08/26/2026 · View digest →

4 pages
100%