M-1 Exhibits 08/26/2026

Application for capital project

Download original
M-1.pdf · PDF · 232.9 KB · 1 page
AI overviewWhat this document contains

This document is an exhibit filed in a Nova Scotia Energy Board regulatory matter. It contains an application for capital project funding by the Town of Mahone Bay Electrical Utility, seeking approval for $2.65 million in spending to upgrade electrical infrastructure as part of the Edgewater Project, which includes replacing aging infrastructure, accommodating future demand, and reducing outages. The document also outlines a request to approve a project to upgrade transmission infrastructure owned by Nova Scotia Power Inc. at a reduced cost, with an expected impact on customer rates.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M13050 — Town of Mahone Bay Electric Utility - Edgewater Project $2,650,000

Filing event: APPLICATION on 08/26/2026

1 page