C-7 Exhibits 10/01/2026

Appellant's Reply to NSP Response - redacted

Download original
C-7.pdf · PDF · 226.4 KB · 2 pages
AI overviewWhat this document contains

This document is an exhibit filed in a Nova Scotia Energy Board regulatory matter. It contains a reply from Jillian Coxhead disputing a large electricity bill from NSP, claiming it was incorrect and not based on actual usage, and notes a significant decrease in her bills after the installation of a digital meter. It also includes an email from Nova Scotia Power regarding the filing of an attachment and standard notices.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M13093 — NSPI DRO Appeal - Billing Issues - Jillian Coxhead

Filing event: APPLICATION on 10/01/2026 · View digest →

2 pages
100%
⬇