E-8Evidence of Nova Scotia Power Inc.
6 passages
2016-2018 DSM Plan Nova Scotia Power Evidence
AI summary The document outlines the 2016-2018 Demand Side Management (DSM) Plan submitted by Nova Scotia Power as evidence in a regulatory proceeding.
DATE FILED: April 10, 2015 Page 3 of 51 1 rate pressure for customers and avoids resource additions for capacity planning purposes 2 until 2032. 3 4 During the course of contract negotiations, NS Power had requested E1 to model a $10 5 mil...
AI summary NS Power requested E1 to model a DSM plan with a lower investment level, but E1 refused and instead proposed a higher spending plan. NS Power is concerned about E1's autonomy, flexibility, and the structure of deliverables and compensation.
Figure 3.6: Ranking of CRPs low and low to a mid-investment level. In terms of a revenue requirement analysis, the Low DSM energy and capacity savings for the $22 million expenditure plan again demonstrates superior near term affordability...
AI summary The text discusses the affordability and cost-effectiveness of different Demand Side Management (DSM) expenditure levels in the context of the 2014 Integrated Resource Plan (IRP). It highlights that the 'Low' DSM energy and capacity savings plan offers superior near-term affordability while remaining cost-effective beyond 2030.
6/17). Similarly, the DSM Plan for Ontario is presented for a six year period (2015 – 2020). 20 EfficiencyOne and Efficiency Maine have not been included in the calculation of the average. Exhibit 7: 2015 Sector Breakdown of the Program Im...
AI summary The text discusses the structure and scope of Demand Side Management (DSM) plans in various jurisdictions, noting that Efficiency Nova Scotia's BNI programs serve both commercial and industrial customers and that ENSC offers one of the most comprehensive DSM portfolios in Canada, which may influence higher initial program costs.
(Tables to be populated by E1, based on the final 2016‐2018 DSM Plan as approved by the UARB.) Total 2016-2018 Program and Sub‐Component Cumulative Annual Net Energy Savings at Generator Cumulative Annual Net Demand Savings at Generator Un...
AI summary The document outlines tables for energy efficiency programs under the 2016–2018 DSM Plan approved by the UARB, including residential, business, and enabling strategies sectors, with metrics such as energy savings and unit costs. These tables are to be populated by E1.
(Technical tables to be provided and populated by E1, based on the final 2016‐2018 DSM Plan as approved by the UARB. NS Power recommends these tables include a column to identify program subcomponents.)
AI summary The document text refers to technical tables to be provided by E1, based on the final 2016-2018 DSM Plan approved by the UARB. NS Power suggests including a column to identify program subcomponents in these tables.
E-11NSPI (CA) RIRs to IR-1 to IR-41 - Redacted
9 passages
NON-CONFIDENTIAL - 1 Please note, the Company has not put forward a DSM plan for the Board's approval. Rather, NS - 2 Power has requested the Board consider our Evidence and direct E1 to design a plan that would - 3 provide DSM spending of...
AI summary The Company has not submitted a DSM plan for approval but has requested the Board to consider its evidence and direct E1 to design a plan with approximately $22 million in spending, aiming for 100 GWh/year in energy savings over the 2016-18 contract period.
2016-2018 DSM Plan (NSUARB M06733) NSPI Responses to Consumer Advocate Information Requests
AI summary This document outlines NSPI's responses to information requests from the Consumer Advocate regarding the 2016-2018 DSM Plan, as part of the NSUARB proceeding M06733.
2016-2018 DSM Plan (NSUARB M06733) NSPI Responses to Consumer Advocate Information Requests
AI summary The document refers to the 2016-2018 DSM Plan and NSPI's responses to information requests from the Consumer Advocate under NSUARB matter M06733.
ELECTRONIC 2016-2018 DSM Plan CA IR-20 Attachment 1 Page 1 of 1 No D SM Half-Lo w DSM Low DSM Base DSM Synapse I Mid DSM 2034 12146 0 _ 992 10174 1972 9555 2590 3251 2035 0 11203 1049 10166 2087 9523 2729 8846 3407 2036 0 1105 10161 2199 2...
AI summary The document presents a table with data related to the 2016-2018 DSM Plan, showing various metrics under different scenarios (e.g., No D, SM, Half-Lo, Low, Base, Synapse I, Mid DSM) for years 2034 to 2039. It includes percentages and numerical values across multiple categories, likely related to demand-side management programs and their impacts.
ELECTRONIC 2016-2018 DSM Plan CA IR-20 Attachment 2 Page 5 of 5 Syn aps id D e M SM 5 201 201 6 201 7 201 8 201 9 202 0 202 1 202 2 202 3 202 4 5 202 202 6 202 7 202 8 202 9 203 0 203 1 203 2 203 3 203 4 5 203 203 6 203 7 203 8 203 9 TUC 1...
AI summary The document presents a table with percentages related to the 2016-2018 DSM Plan, showing varying participation rates across different categories and years. The data reflects performance metrics for various entities and programs during the specified period.
ELECTRONIC 2016-2018 DSM Plan CA IR-20 Attachment 3 Page 8 of 10 Bas D SM e 202 8 202 9 203 0 203 1 203 2 203 3 203 4 5 203 203 6 203 7 203 8 203 9 TU 1 C $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ TU 2 C $ 150 .35 $ 154 .71 $ 154 .97...
AI summary This table presents financial data related to the 2016-2018 DSM Plan, including various cost figures for different units and years. It outlines projected costs for multiple categories, potentially related to demand-side management and energy efficiency initiatives.
ELECTRONIC 2016-2018 DSM Plan CA IR-20 Attachment 3 Page 9 of 10 Syn aps id D e M SM 201 5 201 6 201 7 201 8 201 9 202 0 202 1 202 2 202 3 202 4 202 5 202 6 202 7 ni U Ling 2 an $ $ 47. 81 $ 48. 34 $ 49. 38 $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐...
AI summary The document presents a table with financial data related to the 2016-2018 DSM Plan, showing figures for various entities across multiple years. The data appears to be related to cost or revenue projections, but no explicit claims or arguments are discussed in the text.
$111 REDACTED (CONFIDENTIAL INFORMATION REMOVED) CA IR-20 Attachments 9-12 have been removed due to confidentiality. ELECTRONIC 2016-2018 DSM Plan CA IR-20 Attachment 13 Page 1 of 1
AI summary The document contains a redacted section of the 2016-2018 DSM Plan, with attachments 9-12 removed due to confidentiality. Attachment 13 is included but contains no visible content beyond the heading and page reference.
18 19 20 21 In cases where incremental wind was added (e.g. the No DSM Plan – 150 MW wind block in 2032) above the currently planned and committed wind as shown in CA IR-21, a capacity value of 12 percent was applied. 22 2016-2018 DSM Plan...
AI summary The text discusses the application of a 12% capacity value to incremental wind additions above planned levels, referencing the No DSM Plan – 150 MW wind block in 2032, and mentions the 2016-2018 DSM Plan (NSUARB M06733) and NSPI responses to consumer advocate information requests.
E-13NSPI (E1) RIRs to IR-1 to IR-50 - Redacted
9 passages
Date Filed: May 19, 2015 NSPI (E1) IR-3 Page 2 of 2 2016-2018 DSM Plan (NSUARB M06733) NSPI Responses to EfficiencyOne Information Requests
AI summary The document references the 2016-2018 DSM Plan and NSPI's responses to EfficiencyOne Information Requests, as part of a regulatory proceeding under NSUARB M06733.
2016-2018 DSM Plan (NSUARB M06733) NSPI Responses to EfficiencyOne Information Requests 2016-2018 DSM Plan (NSUARB M06733) NSPI Responses to EfficiencyOne Information Requests
AI summary This document pertains to the 2016-2018 DSM Plan (NSUARB M06733) and includes NSPI's responses to EfficiencyOne's information requests. It is part of a regulatory proceeding related to demand-side management in Nova Scotia.
REDACTED (CONFIDENTIAL INFORMATION REMOVED) CONFIDENTIAL E1 IR-12 Attachments 1-4 have been removed due to confidentiality and have been filed electronically. 2016-2018 DSM Plan (NSUARB M06733) NSPI Responses to EfficiencyOne Information R...
AI summary The document references the 2016-2018 DSM Plan and NSPI's responses to EfficiencyOne information requests, with confidential attachments removed. It pertains to a regulatory proceeding involving demand-side management and Nova Scotia Power Inc.
1 Response IR-20: 2 3 (a) The DSM plan which NS Power discusses in its evidence and included as Appendix B is 4 not intended to be a detailed alternative for approval. However, for the current contract 5 period, the Company's evidence show...
AI summary NS Power discusses a DSM plan in its evidence, noting that it is not intended as a detailed alternative for approval. The plan aligns with energy and demand savings from the 'Low' DSM case, with costs between $20 and $25 million. The NPV difference between the Low DSM and Mid DSM cases is analyzed, showing $151M in savings for the Mid DSM over 25 years.
2016-2018 DSM Plan EOne IR-21 Attachment 1 Page 1 of 1 No DSM Plan CRP01-01-FGD-R01 Low DSM CRP2-17 FGD CRP Mid DSM/FGD Low DSM Half-Low DSM With Half-Low DSM Program Administrator Costs Base DSM (Synapse Model) With Low DSM Program Admini...
AI summary The document presents a comparison of different scenarios for the 2016-2018 Demand Side Management (DSM) Plan, including variations in program administrator costs and other factors. It includes a table with various projects, retirements, and capacity additions over time, along with NPV values and planning and study PV figures.
2016-2018 DSM Plan (NSUARB M06733) NSPI Responses to EfficiencyOne Information Requests
AI summary This document outlines NSPI's responses to EfficiencyOne's information requests regarding the 2016-2018 DSM Plan, which was reviewed by the NSUARB under matter number M06733.
2016-2018 DSM Plan (NSUARB M06733) NSPI Responses to EfficiencyOne Information Requests
AI summary This document references the 2016-2018 Demand Side Management (DSM) Plan and Nova Scotia Power Inc.'s (NSPI) responses to EfficiencyOne's information requests, as part of the NSUARB M06733 proceeding.
2016-2018 DSM Plan (NSUARB M06733) NSPI Responses to EfficiencyOne Information Requests
AI summary The document refers to the 2016-2018 DSM Plan and NSPI's responses to EfficiencyOne's information requests, likely related to demand-side management initiatives and regulatory proceedings under the Nova Scotia Utility and Review Board.
2016-2018 DSM Plan (NSUARB M06733) NSPI Responses to EfficiencyOne Information Requests 2016-2018 DSM Plan (NSUARB M06733) NSPI Responses to EfficiencyOne Information Requests
AI summary This chunk refers to the 2016-2018 DSM Plan (NSUARB M06733) and NSPI's responses to EfficiencyOne information requests, highlighting a regulatory proceeding related to demand-side management initiatives.
62745Board Decision
2 passages
ECOLOGY ACTION CENTRE Jamie Thompson Elizabeth Chant INDUSTRIAL GROUP Nancy G. Rubin, Q.C. Maggie A. Stewart, LL.B. NOVA SCOTIA DEPARTMENT OF ENERGY Stephen McGrath, LL.B. Nancy Rondeaux PORT HAWKESBURY PAPER LP James MacDuff, LL.B. BOARD...
AI summary The Board approved a DSM Plan for 2016-2018 with a total budget of $102,150,000, allocating $33,210,000 in 2016, $34,020,000 in 2017, and $34,920,000 in 2018. The decision was made on August 12, 2015, following hearings in June 2015 and final submissions by July 15, 2015.
Lagend: Filing has not historically triggered an automatic regulatory Filing has historically tr riggered a regulatory process 2019-2021 DSM Plan Filing End of February Based on standardized (ling agreed to/ordered by the CARB Rate and bil...
AI summary The document outlines various filings and reports related to energy efficiency and demand-side management in Nova Scotia. It includes timelines for submissions such as the DSM Plan, evaluation reports, financial statements, and progress reports. It also mentions regular meetings with the Demand-Side Management Advisory Group (DSMAG).
62379Closing Submission - Nova Scotia Power Inc.
4 passages
2016-2018 DSM Plan Nova Scotia Power Closing Submission
AI summary Nova Scotia Power submitted its closing submission for the 2016-2018 Demand Side Management Plan, which outlines energy efficiency and demand-side management initiatives.
ion any alternative 27 DSM plans or scenarios for the Board to consider in fulfilling its statutory obligation of 28 determining whether the DSM programs proposed by E1 were affordable and in the best 1 Public Utilities Act, R.S.N.S. 1989,...
AI summary NS Power argues that E1's DSM Plan is not affordable and does not meet regulatory compliance obligations, proposing instead a more measured plan with annual energy savings of 100 GWh at a cost of $22 million per year. The Board is requested to direct E1 to develop a more affordable alternative.
& lt;sup>10 Ibid, page 169, lines 8-10. 1 2 3 MR. CRANDLEMIRE: I'm not clear what data you're referring to. 4 MR. CLARKE: All of the analysis respecting whatever it is you 5 described the $35 million initial plan or however you describe it...
AI summary The discussion revolves around the submission of a single Demand Side Management (DSM) Plan by E1 to the Board, which is criticized as inconsistent with the Board's consultant's recommendation to consider multiple scenarios. The Board's need for comprehensive data and alternative scenarios is emphasized.
DATE FILED: July 8, 2015 Page 11 of 50 11 2016-2018 Demand Side Management Resource Plan (M06733), Transcript, June 16, 2015, pages 526-527, lines 13-22 and lines 1-2. 12 2016-2018 Demand Side Management Resource Plan (M06733), Transcript,...
AI summary NS Power argues that E1's failure to present alternative scenarios in the 2016-2018 Demand Side Management Resource Plan (M06733) prevents a full examination of affordability and does not meet statutory requirements to justify the proposed plan.
62460Reply Submission - NSPI
4 passages
2016-2018 DSM Plan Nova Scotia Power Reply to Closing Submissions
AI summary Nova Scotia Power provides a reply to closing submissions related to the 2016-2018 Demand Side Management Plan, which outlines energy efficiency and demand reduction initiatives.
& lt;sup>10 CA Closing Submission, July 8, 2015, p. 4. 1 accurate reflection of the evidence. NS Power refers the Board to Table 1 of NS 2 Power's Rebuttal Evidence, which shows that Scenario D provides more DSM at 3 the residential level...
AI summary NS Power addresses the CA's claims regarding the DSM Plan, clarifying that Scenario D provides more DSM at the residential level than the proposed E1 DSM Plan. NS Power also explains that they did not use a constant load shape and considered the benefits of reduced energy load in their analysis.
E1 Closing Submission, July 8, 2015, page 18, lines 8-10. 192016-2018 Demand Side Management Resource Plan (M06733), Transcript, June 18, 2015, pages 662-663. 1 2 Mr. Blunden testified that the Company was only using jurisdictional benchma...
AI summary The document discusses the 2016-2018 Demand Side Management (DSM) Resource Plan (M06733) and the use of benchmarking by NS Power. Mr. Blunden testified that NS Power used benchmarking for guidance on DSM costs in Canada, noting that their spending was higher than other jurisdictions. NS Power also pointed out that the proposed E1 DSM Plan's impact on load was double the average of three Canadian jurisdictions. Mr. Pickles criticized the benchmarking methodology used by Mr. Dunsky, stating it lacked quantitative support.
& lt;sup>47 2016-2018 Demand Side Management Resource Plan (M06733), Transcript, June 18, 2015, page 634, lines 2-16. 48 E1 Closing Submission, July 8, 2015, page 41, lines 20-21.
AI summary The text references the 2016-2018 Demand Side Management Resource Plan and a closing submission by E1, citing specific documents and pages.
62745Board Decision
2 passages
ECOLOGY ACTION CENTRE Jamie Thompson Elizabeth Chant INDUSTRIAL GROUP Nancy G. Rubin, Q.C. Maggie A. Stewart, LL.B. NOVA SCOTIA DEPARTMENT OF ENERGY Stephen McGrath, LL.B. Nancy Rondeaux PORT HAWKESBURY PAPER LP James MacDuff, LL.B. BOARD...
AI summary The Board approved a DSM Plan for 2016-2018 with a total budget of $102,150,000, allocating $33,210,000 in 2016, $34,020,000 in 2017, and $34,920,000 in 2018. The decision was made on August 12, 2015, following hearings in June 2015 and final submissions in July 2015.
Lagend: Filing has not historically triggered an automatic regulatory Filing has historically tr riggered a regulatory process 2019-2021 DSM Plan Filing End of February Based on standardized (ling agreed to/ordered by the CARB Rate and bil...
AI summary The document outlines a timeline and requirements for various filings and reports related to the 2019-2021 DSM Plan, including the submission of financial statements, impact evaluations, and meetings with the DSMAG. It emphasizes the need for standardized filings and periodic reporting.