L-1DRO Notice of Appeal - Redacted 1 passage
Supporting p. p. 0
Supporting documents uploaded: • NSEB Appeal COMPLETE PACKAGE.pdf

AI summary A supporting document, 'NSEB Appeal COMPLETE PACKAGE.pdf,' has been uploaded in this section of the proceeding. This document is likely related to an appeal process involving the Nova Scotia Energy Board.

L-3Appellant's Supporting Documentation - Redacted 1 passage
Payment History p. p. 9
Payment History $4,750.00 paid during the disputed period Account NSEB Appeal

AI summary The document indicates that $4,750.00 was paid during the disputed period related to an account under the NSEB Appeal.

L-4Appellant Supplemental Information (redacted) 3 passages
Preamble p. p. 5
From: fran leslie-thorne Sent: July 12, 2026 9:07 PM To: Energy and Regulatory Boards Tribunal Cc: [email protected] Subject: Supplemental Evidence — NSEB Appeal Reference 2 — Account # You don't often get email from Learn why t...

AI summary Fran Leslie-Thorne and Kevin Scott Lepage submitted supplemental evidence to the Nova Scotia Energy Board regarding an appeal (Reference 260703001) for Account Bedford NS. The evidence includes a significant drop in consumption after a meter swap, an outage discrepancy, a diagnostic code change, and supporting data and documents.

PART 4 — DIAGNOSTIC CODE CHANGE: TIMING RELATIVE TO THE OUTAGE AND THE SCHEDULED TEST p. p. 5
PART 4 — DIAGNOSTIC CODE CHANGE: TIMING RELATIVE TO THE OUTAGE AND THE SCHEDULED TEST - Before the outage: diagnostic code rH05555 (consistent with the reading documented in our June 29, 2026 Meter Comparison Report) - After the outage: di...

AI summary The diagnostic code on a disputed meter changed from rH05555 to rH0455 on July 3, 2026, four days before NS Power's scheduled meter accuracy test. The change occurred during the appeal period, and the party requests NS Power to explain the significance of the code change and whether it affects the meter's recorded accuracy.

PART 5 — UPDATED NEIGHBOUR AND BATCH COMPARISON p. p. 5
PART 5 — UPDATED NEIGHBOUR AND BATCH COMPARISON At the time of the meter swap, our meter's final reading (151,753 kWh) remained approximately 3.06x higher than neighbouring meter streams are reading of 49,649 kWh, consistent with the 3.05x...

AI summary The meter reading after the swap is 3.06 times higher than neighboring meters, consistent with the 3.05x disparity reported in the original appeal.

102642Board Acknowledgment Letter (redacted) 1 passage
Section 2 p. pp. 0-1
suant to Regulatory Rule 12 , a copy of which is attached to this letter. The evidence will, in any case, be made available to NS Power to allow the appeal to be properly addressed. Document: 331614 By copy of this letter, the Board reques...

AI summary The Board has requested NS Power to file a response to an appeal by July 20, 2026, and has directed NS Power to hold disconnection notices on the property until a decision is made. The appeal process involves providing evidence and allowing for a response from the appellant.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →