Matter: Nova Scotia Power Inc. - CI C0017098 – Ragged Lake Generator Replacement - $1,681,714 (FIN)
1 passage 1 document

Asset Management across all matters →

N-1Application 1 passage
DESCRIPTION: p. p. 1
DESCRIPTION: The NS Power Control Centre is critical for the safe and reliable operation of the Nova Scotia electrical system and is essential for the operation of the NS Power generation fleet, operation of the interconnections to New Bru...

AI summary The NS Power Control Centre is vital for grid operations and is currently supplied by a 32-year-old electrical system that requires replacement. The project involves upgrading generators, switchgear, and other infrastructure to ensure reliable backup power. The asset is classified under General Plant – Buildings Structures and Grounds with an estimated life of 30 years.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →