3.8.1 Description The plan and details of Option P-1 are shown on Drawing SK-007. This option consists of closing off all tidally influenced inflows to the tidal pond area, except at the most downstream end, by constructing a berm in the w...
AI summary Option P-1 involves constructing a berm to block tidal inflows into a tidal pond, maintaining wetland functions while preventing fish migration. An aboiteau will be built at the downstream outlet, requiring regular maintenance. Swamp mats will aid construction access. The design aims to manage extreme water levels and preserve ecological integrity.