HomeAsset ManagementM12798Evidence
Topic/Matter Intersection

Topic:"Asset Management" in M12798

Matter: Nova Scotia Power Inc. - CI C0080108 – L-5532 Replacements and Upgrades Phase 1 - $3,455,473
2 passages 2 documents

Asset Management across all matters →

N-1Application - CI C0080108 L5532 Replacements and Upgrades Phase 1 1 passage
DESCRIPTION: p. p. 1
DESCRIPTION: L-5532 is a 95.9 kilometer (1,128 structures) 69 kV transmission line, built in 1955, that connects the 13V Gulch Hydro, 14V Ridge Hydro, 75V South Milford, 76V Maitland, 7W Harmony, 57W Caledonia, 91W Middlefield, and 3W Big...

AI summary The L-5532 69 kV transmission line project involves replacing deteriorated assets (wood poles, insulators, etc.) on 75 structures as part of a multi-year refurbishment program. It connects multiple substations and is the first phase of NS Power's planned upgrades to this 95.9 km line, originally constructed in 1955.

101795NSEB (NSPI) IR-1 to IR-3 1 passage
Request IR-1: p. p. 2
Request IR-1: - The application notes that this project includes the replacement of deteriorated assets on 75 - structures. The application also notes that this project is required to replace deteriorated assets - that have been identified...

AI summary The application seeks approval for replacing deteriorated transmission line assets, including wood poles and insulators, at a total cost of $3.46 million. It references prior approvals for similar projects (M12506, M12203) and requests detailed scope breakdowns and cost variance explanations.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →