DESCRIPTION: L-5532 is a 95.9 kilometer (1,128 structures) 69 kV transmission line, built in 1955, that connects the 13V Gulch Hydro, 14V Ridge Hydro, 75V South Milford, 76V Maitland, 7W Harmony, 57W Caledonia, 91W Middlefield, and 3W Big...
AI summary The L-5532 69 kV transmission line project involves replacing deteriorated assets (wood poles, insulators, etc.) on 75 structures as part of a multi-year refurbishment program. It connects multiple substations and is the first phase of NS Power's planned upgrades to this 95.9 km line, originally constructed in 1955.