NON-CONFIDENTIAL 3 The scope of work completed during the outage was concentrated on the principal risk 1 2 4 areas identified through this process, including boiler pressure parts, coal and ash handling 5 systems, electrical and control e...
AI summary The text discusses the scope of work completed during an outage at Lingan Unit 2, focusing on refurbishing or replacing critical systems such as boiler pressure parts, electrical equipment, and valves based on condition assessments and testing results to ensure safe and reliable operation.