Home›Billing Procedures›M12661›Evidence
Topic/Matter Intersection

Topic:"Billing Procedures" in M12661

Matter: Nova Scotia Power - Application for approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (PHP)
7 passages 4 documents

Billing Procedures across all matters →

N-5NSPI (CA) RIR 1 to 9 - Redacted 1 passage
EXHIBIT 3 PAGE 1 OF 5 p. p. 201
PHP (10) (11) MUNICIPAL UNMETERED (12) ALLOCATION FACTOR

AI summary The text appears to be a table or data entry related to municipal unmetered allocation factors, likely part of a regulatory proceeding involving cost allocation or utility billing procedures.

N-6NSPI (IG) RIR 1 to 31 - Redacted 3 passages
NOVA SCOTIA POWER INC. p. p. 181
NOVA SCOTIA POWER INC. (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL INDUSTRIAL INDUSTRIAL (7) MEDIUM (8) LARGE (9) (10) (11) ELI 2P-RTP MUNICIPAL UNMETERED (12) ALLOCATION FACTOR (16)...

AI summary This table presents detailed cost breakdowns for various services provided by Nova Scotia Power Inc., including meter reading, customer experience, billing, and credit services, categorized by different customer segments and accompanied by references to exhibits and orders.

NOVA SCOTIA POWER INC. p. p. 181
NOVA SCOTIA POWER INC. (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL (7) MEDIUM INDUSTRIAL INDUSTRIAL INDUSTRIAL (8) LARGE (9) ELI 2P-RTP (10) (11) MUNICIPAL UNMETERED (12) ALLOCATION FACTOR (16)...

AI summary The document outlines various operational costs and expenses for Nova Scotia Power Inc. across different service categories, including meter reading, customer experience, call centre operations, billing services, and others, with detailed breakdowns by customer segment and associated references.

FOR THE YEAR ENDING DECEMBER 31, 2027 p. p. 181
FOR THE YEAR ENDING DECEMBER 31, 2027 (1) TOTAL (2) (3) SMALL (4) (5) GENERAL (6) SMALL (7) MEDIUM (8) LARGE (9) (10) (11) (12) ALLOCATION (6) SECONDARY CUSTOMER (7) WEIGHTED FACTOR (8) WEIGHTED TOTAL (9) RESPONSIBILITY 100.00% 527,239 486...

AI summary The document presents a detailed breakdown of customer distribution, billing numbers, and revenue billed for the year ending December 31, 2027, with various categories and percentages of responsibility allocated across different customer segments.

N-18Materials from ELID Tariff Technical Conference 1 passage
NON-CONFIDENTIAL p. p. 14
NON-CONFIDENTIAL 1 (AGC) volumes will be included on PHP's bill as appropriate and PHP will be 2 billed at the above-the-line rate for the remaining energy volume. If PHP's demand 3 is such that it requires energy during these higher-varia...

AI summary The text outlines billing arrangements for PHP (Port Hawkesbury Paper), including DR (Dispatchable Rider) credits and cost absorption by FAM. A table compares optimized and flat cost scenarios, showing PHP's net bill remains unchanged despite DR adjustments. FAM absorbs the difference, which is apportioned to customers.

20260921-1Hearing Transcript — 09/21/2026 (MICHAEL WILLETT, ERIC FERGUSON, CRAIG MOWATT, DAVID STANFORD) 2 passages
A. (Mowatt) I think you meant monthly.
A. (Mowatt) I think you meant monthly. 1 So are you talking about specifically around the billing 2 of PHP for the wind? 3 Q. I guess there's no requirement for the 4 Goose Harbour output to be consumed in the hour it's 5 generated; correc...

AI summary The discussion revolves around the billing mechanism for wind energy production at Goose Harbour, specifically how output is aggregated and reconciled with PHP's consumption. The process involves monthly billing with annual reconciliation, allowing for energy banking and offsetting during periods of varying prices.

NOVA SCOTIA POWER PANEL 321 Cr-ex, (Rudderham)
NOVA SCOTIA POWER PANEL 321 Cr-ex, (Rudderham) 1 A. (Mowatt) The billing period itself is 2 a month. So it would just be carrying forward to a future 3 month, not to a future year. There's an annual 4 reconciliation process per the PSA tha...

AI summary The document discusses billing periods, reconciliation processes, administration fees, and energy transportation under agreements between Nova Scotia Power and the Public Utilities Board. The billing period is monthly with annual reconciliation, and there are provisions regarding administration fees and line losses.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →