Home›Billing Procedures›M13108›Evidence
Topic/Matter Intersection

Topic:"Billing Procedures" in M13108

Matter: NSPI DRO Appeal - Billing Issues - Kate Strong
4 passages 4 documents

Billing Procedures across all matters →

S-1Notice of Appeal (redacted) 1 passage
Section 1
Appeal - NS Power Dispute Resolution Officer (DRO) Reference Number: 260923001 Submitted on: Wednesday, September 23 2026 at 12:53:37 PM (ADT) Contact Information Name on account: Kate Strong Account number: Business contact: Account addre...

AI summary A billing issue complaint was submitted to the DRO by Kate Strong on September 23, 2026, regarding a consumption dispute. The DRO made a decision on September 18, 2026, and the complainant hopes for resolution through this appeal. Supporting documents were uploaded as 'dispute.zip'.

S-2DRO Decision d. September 18, 2026 (redacted) 1 passage
Don Farmer, P. Eng., Dispute Resolution Officer (D.R.O.) [email protected]
ect the number displayed on a subsequent reading. If for example a reading of 1000 is reported as 100, the next time a reading is taken it will still be something in excess of 1000 - so if a Customer- was billed for 100 Kwb when it should...

AI summary This document discusses a consumption dispute related to incorrect meter readings leading to billing errors. It emphasizes that NSP is responsible for delivering power to the metering point, not for on-premise energy usage. Meter accuracy is the key factor in determining correct billing. NSP conducted an 'as found' meter accuracy test confirming the meter was operating within prescribed limits.

S-3NSPI Response to Appeal (redacted) 1 passage
REDACTED
and asked NS Power to provide its position in the matter as well as relevant account documentation. This is referenced on pages 2 to 3 of 25 in the DRO file attached as Confidential Attachment 1 . - August 21, 2026 Ms. Strong confirmed her...

AI summary NS Power provided its position to the DRO regarding Ms. Strong's Equal Billing Plan, explaining that her monthly payments were adjusted due to increased electricity usage following the installation of a heat pump. The usage doubled between April 2024 and April 2026, and NS Power stated that the billing was updated appropriately.

S-4Appellants Reply to NSPI Response (redacted) 1 passage
Section 2
hat time. I contacted my heat pump supplier to tell them what your care rep said and they were adamant that the heat pump would not double my power usage, especially the way I was using it so little. When the gal asked if I was using somet...

AI summary Kate Strong disputes her electricity bill, claiming that her power usage doubled between 2024 and 2026 despite reduced appliance use. She questions the accuracy of the billing and requests an investigation, noting that other households with higher usage have similar bills.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →