20 numerous bring to roadside projects have been advanced to reduce outage 1 interruptions. These feeders present operational challenges and constraints that 8/4/2023 11S-411 2.66 5 Tree Contacts 7/30/2023 11S-411 2.63 1 Unknown Date Feede...
AI summary The text presents a list of outages on feeder 11S-411, detailing dates, durations, number of customers impacted, and causes such as defective equipment, foreign interference, and tree contacts. These outages highlight operational challenges and the need for improvements in the distribution system.
15 Centralized/decentralized schemes are not applied at the feeder level, rather the design 16 involves multiple feeders in a given area. All feeders outlined in the project are required to 17 complete this scheme. This does not include AF...
AI summary The text discusses a centralized/decentralized scheme applied across multiple feeders in a given area, excluding AFUDC, AO, and NRCan Contributions. It outlines the requirement for all feeders in the project to complete the scheme.