Topic/Matter Intersection

Topic:"Distribution Planning" in M12773

Matter: NSPI DRO Appeal - Billing Issues - Celine Franz
1 passage 1 document

Distribution Planning across all matters →

F-9Meter Results - Redacted 1 passage
Have a safe day, Derek.
Have a safe day, Derek. Electric Meter To est Results - Screen T ns Help Three \ \ \ NOVA SCOT ia pow ER INC. \ – × Electric Meter Test Results - Screen Three Equip Type Equip ID MTRE 2314908 Dal Op te Code 2026/09 TEST /29 17 FLSASLKWH FL...

AI summary The text contains snippets of electric meter test results screens from a Nova Scotia Power Inc. system, including equipment details, test dates, and replacement parts. It appears to be a technical log or form used during meter testing procedures.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →