1 2.3 System Data 2 3 In its letter dated July 15, 2020 with respect to the 2020 PLT Report, the NSUARB also directed 4 as follows: 5 In addition, when preparing future PLT reports, the Board directs NS Power to identify the number of cust...
AI summary The NSUARB directed NS Power to include specific system data in future PLT reports, such as the number of customers, distribution and transmission line lengths, substations, and peak load, broken down by operating regions. The report also highlighted an unusually high number of outage-related supervisor call-backs in the Metro region and requested explanations and potential solutions.
21 Figure 9 – NS Power System Data (2025) Region # of Km of Km of Substations Regional Peak Customers Distribution Transmission Load Non Lines Lines Coincident (MW) West 117,911 8,443 1,334 57 690 Metro 258,989 5,910 981 40 1,015 Northeast...
AI summary Figure 9 presents NS Power's system data for 2025, including the number of customers, distribution and transmission lines, substations, and regional peak load by region. The document notes a change in the definition of a substation, excluding stepdown transformers from the count.