Topic/Matter Intersection

Topic:"Electricity Generation" in M12745

Matter: Nova Scotia Power Inc. - CI C0080671 – LIN1 HP IP Turbine Refurbishment 2026 - $3,249,384
3 passages 2 documents

Electricity Generation across all matters →

N-2NSPI (NSEB) RIR 1 to 4 - Redacted 2 passages
NON-CONFIDENTIAL p. p. 10
NON-CONFIDENTIAL 1 Response IR-1: 2 3 (a) Lingan 1 has a nameplate capacity of 150 MW and a net capacity rating of 153 MW. 4 5 (b) Please refer to the table below for annual net generation (MWh) since 2010.

AI summary The response provides details on the Lingan 1 power generation facility, including its nameplate and net capacity, and references a table with annual net generation data from 2010 onwards.

6 p. p. 10
6 Year Net Gen (MWh) 2010 859,668 2011 931,836 2012 838,152 2013 873,020 2014 698,744 2015 695,126 2016 758,951 2017 604,673 2018 588,220 2019 725,843 2020 738,097 2021 731,802 2022 580,068 2023 464,444 2024 501,747 2025 692,480 7

AI summary The table presents net generation (in MWh) from 2010 to 2025, showing fluctuations in electricity production over time. The data reveals a significant decline in generation from 2014 to 2023, followed by a slight increase in 2024 and 2025.

101625NSEB (NSPI) IR-1 to IR-4 1 passage
Request IR-1:
Request IR-1: - Page 1 of the application notes that the Lingan Unit 1 steam turbine consists of a dual flow low - pressure (DFLP) and a combined high and intermediate pressure (HIP) turbine that convert - steam, supplied by the Lingan boi...

AI summary Request IR-1 seeks information about Lingan Unit 1, including its rated capacity, energy production since 2010, emissions classification, retirement date, post-retirement role, alignment with NS Power's 2030 renewable target, refurbishment efforts, and utilization factors post-2030.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →