Matter: Nova Scotia Power Inc. - CI C0064966 – Tusket Tidal Pool Fish Passage - $1,763,971
2 passages 1 document

Electricity Generation across all matters →

N-1Work Order - Redacted 2 passages
Technical Deliverables: p. p. 1
Technical Deliverables: - Not Required (NR): Deliverable may not be required for all estimates of the specified class, but specific project estimates may require at least preliminary development. - Started (S): Work on the deliverable has...

AI summary The document outlines technical deliverables for hydropower projects, categorizing them into stages (Not Required, Started, Preliminary, Complete). It details key components of hydropower facilities, including reservoir preparation, principal structures, environmental mitigation, and owner costs. The text emphasizes the importance of user requirements and environmental data in defining project scope.

1.1 Description of the System p. p. 15
1.1 Description of the System The Tusket Hydro System is located in Yarmouth County, Nova Scotia and is owned and operated by NSPI. This hydro system has been in continuous operation since 1929 and consists of one (1) hydroelectric generat...

AI summary The Tusket Hydro System, owned by NSPI since 1929, consists of three generating units (2.7 MW total capacity) and four reservoirs in Yarmouth County, Nova Scotia. It diverts water from Lake Vaughan through a power canal to the Tusket powerhouse, with a drainage area of 1462 km². Figures 1-1 and 1-2 illustrate its location and site plan.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →