N-12025 Community Feed-In Triff Report 1 passage
15 cost of ultra-low sulphur diesel fuel. p. p. 8
15 cost of ultra-low sulphur diesel fuel. Committed COMFIT Distribution Projects - December 31, 2025 In-Service (as of Dec. 31, 25.09 85,753.4 $11,233,699 2025) TOTAL 25.39 85,753.4 $11,233,699 DSIS Study Group #7 229 NA 432 2012-09-14 Han...

AI summary The text discusses the cost of ultra-low sulphur diesel fuel and provides a table with details on committed COMFIT distribution projects as of December 31, 2025, including information on various energy projects such as wind and biomass installations, their locations, capacities, costs, and statuses.

101470Board letter re report / accepted as filed 3 passages
M12687 – Nova Scotia Power Incorporated – 2025 Community Feed-In Tariff Report p. p. 0
M12687 – Nova Scotia Power Incorporated – 2025 Community Feed-In Tariff Report In its Decision dated July 4, 2011, about Renewable Energy Feed-In Tariffs, the Nova Scotia Utility and Review Board stated: [275] In order to monitor the level...

AI summary The 2025 Community Feed-In Tariff (COMFIT) Report outlines the status of 88 COMFIT projects totaling 152.98 MW as of December 31, 2025, and details the energy purchased by NS Power in 2025 at an average cost of $134.96 per MWh. The report references the end of the COMFIT program to new applicants as of August 6, 2015.

Year Number of Projects Total Installed MW Total Purchased MWh Total Cost in dollars Average Cost $/MWh p. p. 0
Year Number of Projects Total Installed MW Total Purchased MWh Total Cost in dollars Average Cost $/MWh 2015 52 107.40 280,299 36,589,770 130.54 2016 73 138.83 413,932 56,112,871 135.56 2017 83 153.78 525,927 71,057,464 135.11 2018 90 156....

AI summary The table provides data on the number of projects, total installed MW, total purchased MWh, total cost in dollars, and average cost per MWh from 2015 to 2025. It is used to compare the COMFIT generation and cost to provincial totals.

Preamble p. p. 0
In its 2025 Annual Load Forecast Report, NS Power indicated that the total system energy requirement was forecast at 11,607 GWh[1](#page-1-0) . The 2025 Fuel Adjustment Mechanism (FAM) Annual Report[2](#page-1-1) subsequently reported an a...

AI summary NS Power's 2025 Annual Load Forecast Report estimates total system energy at 11,607 GWh, while the actual system requirement was 11,473.6 GWh according to the Fuel Adjustment Mechanism (FAM) Report. COMFIT energy accounted for 4.4% of total system energy but 6.4% of fuel and purchased power costs, with a higher cost per MWh compared to the average fuel cost.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →