Topic/Matter Intersection

Topic:"Energy Efficiency Resource Assessment Model" in M12373

Matter: Nova Scotia Power Inc. - CI C0067908 – POA Boiler Refractory Refurbishment 2025 – $1,378,466
1 passage 1 document

Energy Efficiency Resource Assessment Model across all matters →

N-1Application 1 passage
Inclusions p. pp. 5-7
Inclusions For the purposes of this document, the term process industries is assumed to include firms involved with the manufacturing and production of chemicals, petrochemicals, and hydrocarbon processing. The common thread among these in...

AI summary This document defines 'process industries' and outlines the scope of a recommended practice (RP) for estimating costs in projects involving process facilities, including mechanical and chemical equipment, piping, and electrical power systems. It applies to various project delivery methods and excludes power generation and high-voltage transmission. A quote for refractory materials during the 2025 Fall Shut-down is also included.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →