Topic/Matter Intersection

Topic:"Energy Efficiency Resource Assessment Model" in M12942

Matter: NSPI DRO Appeal - Billing Issues - Kevin Lepage
4 passages 1 document

Energy Efficiency Resource Assessment Model across all matters →

L-3Appellant's Supporting Documentation - Redacted 4 passages
PART 2 — COMPLETE BILLING HISTORY REVEALS METER ANOMALY BEGAN IN 2021 p. p. 7
PART 2 — COMPLETE BILLING HISTORY REVEALS METER ANOMALY BEGAN IN 2021 We have compiled our complete billing history from the date of first service in August 2019 to present. This history reveals a dramatic and unexplained increase in recor...

AI summary The complete billing history from August 2019 to the present shows a significant and unexplained increase in energy usage starting in 2021, prior to any changes in household energy consumption.

Year Total kWh Avg kWh/Day EV in House? Notes p. p. 7
Year Total kWh Avg kWh/Day EV in House? Notes 2019 (Aug-Dec) 3,564 ~20 No Normal — meter brand new 2020 17,441 ~24 No Normal — typical residential usage 2021 17,376 ~48 No Usage doubles — nothing changed in house 2022 17,666 ~48 No Stays h...

AI summary Energy usage doubled between 2020 and 2021 without changes in household occupancy or appliances. The meter anomaly predates the EV purchase and 2025 cyberattack. Usage remained high even after acquiring an EV in 2024, with an unexpected spike in 2025 due to a broken AC.

Item YOUR Meter #2047502 NEIGHBOUR Meter #2047503 p. p. 7
Item YOUR Meter #2047502 NEIGHBOUR Meter #2047503 Serial Number 2047502 2047503 Make / Model Itron Centron OpenWay Riva Itron Centron OpenWay Riva Firmware FW1: 164 FW1: 164 Manufacture Date August 2019 (8/19) August 2019 (8/19) Multiplier...

AI summary Meter #2047502 shows a significantly higher cumulative consumption (151,066 kWh) compared to the identical neighboring meter #2047503 (49,565 kWh), suggesting a potential overcounting issue. This discrepancy, despite both meters being manufactured and installed concurrently, warrants formal accuracy testing and recalibration.

Date: March 19, 2025 Analysis Date: June 23, 2026 p. p. 9
Date: March 19, 2025 Analysis Date: June 23, 2026 CONTRACTOR OF STREET HISTO DV ACTI IAI DII IC HISTORY — P CTUAL BILLS Energy Charge Taxes & Other Total New Charges Estimated? Notes $472.45 $23.62 $496.07 No $853.70 $42.69 $896.39 No $665...

AI summary The document presents a series of electricity bills with energy charges, taxes, and total new charges, noting that estimated billing periods occurred due to a cyberattack and that energy usage increased compared to prior years, which was unexpected.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →