K-2DRO Decision d. September 14, 2026 (redacted) 1 passage
Amritpal
Amritpal Board approved Regulations 5.1, 5.3, 5.5, 6.4, and 6.7 are relative to tis matter. Also relevant and attached are the Electricity and Gas Inspection Act Regulation. Your dispute is a "consumption dispute". A fundamental point I mu...

AI summary The Board approved several regulations relevant to the matter, emphasizing that NSP's responsibility is to deliver power to the metering point, not control on-premise energy use. Meter accuracy is highlighted as the key factor in determining appropriate billing, with instructions for NSP to test the serving meter for accuracy.

K-4Appellants Reply to NSPI Response (redacted) 1 passage
Past electric use:
Past electric use: Bill Energy date used No. of days kWh per day Dec 24 3062 57 53.7 Oct 24 943 26 36.3 Nova Scotia Power Inc.

AI summary The document provides a summary of past electric use, showing energy consumption data for specific dates, and includes the name of the organization involved, Nova Scotia Power Inc.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →