Topic/Matter Intersection

Topic:"Environmental Compliance" in M12371

Matter: Nova Scotia Power Inc. - CI C0061005 – POA Cell Capping 2025 – $2,530,405
51 passages 5 documents

Environmental Compliance across all matters →

N-1Application 4 passages
DESCRIPTION: p. p. 1
DESCRIPTION: This project is for the capping of Ash Disposal Cell 2 at the Point Aconi Generating Station Residue Management Site (RMS). The execution of this work is mandated by the conditions set forth in Point Aconi's Industrial Permit,...

AI summary This document describes the capping of Ash Disposal Cell 2 at the Point Aconi Generating Station, required by the Industrial Permit and the Environment Act. The project aims to minimize environmental impact and reduce wastewater generation. NS Power provided notice to DDA proceeding participants as per the Board's directive (M11220).

Why do this project? p. p. 1
Why do this project? Capping of decommissioned ash disposal cells at the RMS is a requirement under the Point Aconi Generating Station's approved industrial permit issued by the Department of Environment and Climate Change (Department), in...

AI summary The project involves capping decommissioned ash disposal cells at the RMS as required by the Point Aconi Generating Station's industrial permit. This action is the final stage of closure and aims to minimize environmental impacts by establishing a stable, vegetated cover. Water quality monitoring will ensure compliance with discharge criteria.

Why do this project this way? p. p. 1
Why do this project this way? A topographical survey was conducted to assess the existing condition of Cell 2 and document its surface features. The data collected was used to develop a detailed model of the cell, enabling the identificati...

AI summary A topographical survey was conducted for Cell 2 to assess its condition and develop a detailed model. A liner-style cap was chosen for its cost-effectiveness, containment performance, and compliance with environmental standards. Diverting runoff from the cell reduces hydraulic loading on the wastewater treatment pond, enhancing climate resilience.

Document No: XXX-XX-XXXX-XXXX p. p. 5
Document No: XXX-XX-XXXX-XXXX Project Cost Estimate Input Checklist and Maturity Matrix Integrated Project Plan Defined (D) NR P D D D Project Code of Accounts Defined (D) NR P D D D Project Schedule Regulatory Approval & Permitting Define...

AI summary The document presents a checklist and maturity matrix for project cost estimate inputs, focusing on various project planning and regulatory requirements. It details the status of different project components, such as the Integrated Project Plan, Risk Register, and Environmental Impact Assessment, with statuses ranging from 'Defined (D)' to 'Not Applicable (NA)'.

N-2NSPI (NSEB) RIRs 1-11 44 passages
Province of Nova Scotia Environment Act, S.N.S. 1994-95, c.1 s.1 p. p. 3
Province of Nova Scotia Environment Act, S.N.S. 1994-95, c.1 s.1 APPROVAL HOLDER: NOVA SCOTIA POWER INCORPORATED SITE PID: 15298243, 15301369, 15301393, 15302359, 15495195, 15513997, 15621097, 15621105, 15621113, 15621121, 15621139, 156344...

AI summary Nova Scotia Power Inc. has been granted approval under the Environment Act for an industrial power plant activity, with specific terms and conditions. The approval expires on June 30, 2026, and is administered by Malcolm MacNeil. The Minister's responsibilities have been delegated to the Administrator.

1. Definitions p. p. 3
1. Definitions - a. Act means Environment Act. 1994-95, c.1, s.1, and includes, unless the context otherwise requires, the regulations made pursuant to the Act, as amended from time to time. - b. Administrator means a person appointed by t...

AI summary The document defines key terms under the Environment Act, including 'Act,' 'Administrator,' 'Approval Holder,' and others, with specific references to Nova Scotia Power Incorporated and the Point Aconi Generating Station.

5. Tank and Pipeline Inspections p. p. 3
5. Tank and Pipeline Inspections - a. The Approval Holder(s) shall develop and maintain an Assessment Program for petroleum and dangerous goods storage tanks, pipelines, and systems to verify that the Facility is compliant with provincial...

AI summary The document outlines requirements for tank and pipeline inspections, including the development of an assessment program by the Approval Holder(s), compliance with provincial regulations, involvement of a licensed Professional Engineer, and maintenance of inspection and repair records for oil/water separators.

6. Air Quality p. p. 3
valuate emission sources at any stationary vent, stack and storage area at the facility that releases, or has the potential to release air contaminants to the environment; - iii. Include emission source characterization comprised of: - (a)...

AI summary The text outlines requirements for evaluating emission sources at stationary vents, stacks, and storage areas, including the characterization of these sources with specific details such as height, diameter, gas exit velocity, and temperature.

7. Particulate Emissions (Dust) p. p. 3
7. Particulate Emissions (Dust) a. The Approval Holder(s) shall ensure all vehicles used for the transportation of fuels stock and limestone are covered to avoid dusting along the delivery route. - b. The Approval Holder(s) shall ensure al...

AI summary The document outlines requirements for managing particulate emissions (dust) from the Site, including vehicle coverage, fugitive dust limits, monitoring programs, and potential mitigative actions by the Department if limits are exceeded or complaints are received.

8. Surface Water p. p. 3
8. Surface Water - a. The Approval Holder(s) shall conduct analytical sampling of surface water locations as per the table titled "Surface Water Sampling Requirements", attached in Appendix A. - b. The Approval Holder(s) shall direct all s...

AI summary The document outlines requirements for surface water management, including sampling, monitoring, erosion control, and compliance with water quality standards. It emphasizes the need for adherence to environmental guidelines, reporting obligations, and the Department's authority to enforce modifications.

11. Contingency Plan p. p. 3
11. Contingency Plan - a. The Approval Holder(s) shall maintain and routinely update a Contingency Plan for the Site in accordance with the Departments Contingency Planning Guidelines dated May 10, 2016, as amended from time to time. The C...

AI summary The contingency plan requires the Approval Holder(s) to maintain and update a plan in accordance with guidelines, ensure personnel training, and keep a copy onsite for addressing environmental emergencies.

12. Reporting p. p. 3
- (v) Summary of any updates to the Contingency Plan (as per the Contingency Plan Section of this Approval) over the previous year of operation, including the current revision number and date of review(s) and, if applicable, the dates of r...

AI summary The document outlines reporting requirements for the Approval Holder(s), including updates to the Contingency Plan and annual reports on air quality, groundwater, surface water, and wastewater effluent. It specifies the need for summaries of air quality monitoring programs, incidents, operational problems, and public complaints.

format; p. p. 3
format; - (iv) Laboratory certificates of analysis; and - (v) The identification of any adverse impacts to surface water / storm water as a result of site activities and associated recommendations, as applicable. - h. The annual report for...

AI summary The document outlines requirements for the annual report on surface water and storm water, including the need for laboratory certificates of analysis, identification of adverse impacts, and submission of wastewater effluent monitoring data. The report must be prepared by a licensed Professional Engineer in Nova Scotia.

13. Releases p. p. 3
13. Releases - a. Spills or releases shall be reported in accordance with the Act and the Environmental Emergency Regulations. - b. Spills or releases shall be cleaned up in accordance with the Act and the Contaminated Sites Regulations.

AI summary The section outlines requirements for reporting and cleaning up spills or releases in accordance with relevant regulations, emphasizing compliance with the Act and specific environmental regulations.

17. Fuel Specification p. p. 3
17. Fuel Specification - a. The Approval Holder(s) shall burn a combination of petroleum coke and coal as primary fuel for this facility. - b. The Approval Holder(s) may burn No. 2 and No. 6 fuel oil as secondary fuels at the facility. The...

AI summary The document outlines fuel specifications for a facility, including primary and secondary fuel types, sulphur content requirements, fly ash management, record-keeping obligations, and procedures for testing alternate fuels with the Department's approval.

19. Burning and Storage of Used Oil p. p. 3
19. Burning and Storage of Used Oil - a. The Approval Holder(s) may store or burn used oil on the Site for the purpose of used oil as an alternative fuel, conditional on compliance with the Used Oil Regulations, Petroleum Management Regula...

AI summary This section outlines the conditions for storing and burning used oil at a facility in Nova Scotia, including compliance with regulations, restrictions on off-site used oil, requirements for laboratory analysis, storage of analysis certificates, and reporting obligations to the Department.

26. Cooling Water Management p. p. 3
26. Cooling Water Management - a. The Approval Holder(s) shall continuously monitor temperature at the condenser inlet and outlet for all units and record the maximum daily temperature at the condenser inlet and outlet for all units. This...

AI summary This section outlines requirements for cooling water management, including temperature monitoring, risk mitigation strategies for sponge ball loss, and measures to protect aquatic life. Chlorination for biofouling control is explicitly prohibited.

28. Air Emissions p. p. 3
28. Air Emissions - a. The Approval Holder(s) shall limit the mean rate of discharge of particulate matter in flue gas emissions from Unit 1 to 160 milligrams per reference cubic meter of dry flue gas at standard reference conditions of 25...

AI summary The document outlines air emissions requirements for the Approval Holder, including limits on particulate matter discharge, opacity standards for stack emissions, reporting obligations, and source testing protocols. These measures aim to ensure compliance with environmental regulations and monitoring standards.

i. Test Methods: p. p. 3
i. Test Methods: - (a) Nitrogen Oxide Environment Canada Reference Method for the Monitoring of Gaseous Emissions from Fossil Fuel-fired Boilers (EPS 1/RM/15); - (b) Sulphur Dioxide Environment Canada Reference Method for the Monitoring of...

AI summary The document outlines test methods for monitoring emissions from fossil fuel-fired boilers, including specific reference methods for nitrogen oxide, sulphur dioxide, particulate matter, and fine particulate matter. It specifies the required emission rates, concentrations, and reporting conditions for each pollutant.

Surface Water Sampling Requirements p. p. 3
Surface Water Sampling Requirements Sampling Requirements Sampling Frequency Location Identifier General Chemistry, Total Metals, Petroleum Hydrocarbons Quarterly Pla Plant Site Coal Pile Runoff Pond General Chemistry, Total Metals Quarter...

AI summary The document outlines surface water sampling requirements, specifying parameters, frequencies, and locations for monitoring at various sites, including plant sites, residue management sites, and ponds. Sampling frequencies range from annual to quarterly, with specific locations identified for each requirement.

\ \ \ Quarterly sampling frequency means samples shall be collected four times per calendar year. Quarterly sampling shall occur within the following allotted timeframes: January-March; p. p. 3
\ \ \ Quarterly sampling frequency means samples shall be collected four times per calendar year. Quarterly sampling shall occur within the following allotted timeframes: January-March; Parameter Discharge Limit рН 6.0 – 9.5 Total Suspende...

AI summary The text outlines quarterly sampling frequency requirements for environmental monitoring, specifying parameters and their corresponding discharge limits for various contaminants, including pH, suspended solids, metals, and petroleum hydrocarbons. It also includes tables detailing chemical parameters and associated measurements.

REFERENCE DOCUMENTS p. p. 3
REFERENCE DOCUMENTS - 1) Letter : dated May 24, 2023, RE: Point Aconi Operating Approval Amendment Request (Approval No. 2007-058666-06), and attachments, and signed by Chad Graham. - 2) Quality Processes: Assessment Program Documents: a)...

AI summary The document lists reference materials related to a Point Aconi Operating Approval Amendment Request, including letters, quality assurance programs, specifications, and drawings, all submitted by Nova Scotia Power and associated entities.

1.1 RELATED REQUIREMENTS p. p. 3
1.1 RELATED REQUIREMENTS - .1 Section 01 14 00 Work Restrictions - .2 Section 01 35 29.06 Health and Safety - .3 Section 01 35 43 Environmental Procedures

AI summary This section outlines specific requirements related to work restrictions, health and safety, and environmental procedures under the project's regulatory framework.

1.4 WORK SEQUENCE (IF AWARD IS ISSUED) p. p. 3
1.4 WORK SEQUENCE (IF AWARD IS ISSUED) - .1 No Work shall be undertaken at the construction Site until the Contractor's Environmental Management Control Plan has been submitted and approved by the Engineer, and its provisions implemented o...

AI summary The work sequence outlines requirements for construction at the site, including the submission and approval of an environmental management control plan, completion of site orientation by Nova Scotia Power, staged construction, quality control, and fire access maintenance.

1.1 RELATED REQUIREMENTS p. p. 3
1.1 RELATED REQUIREMENTS - .1 Section 01 11 00 Summary of Work - .2 Section 01 35 29.06 Health and Safety - .3 Section 01 35 43 Environmental Procedures

AI summary This section outlines related requirements including summary of work, health and safety procedures, and environmental procedures as part of a regulatory process.

1.3 DEFINITIONS p. p. 3
1.3 DEFINITIONS - .1 Environmental Pollution and Damage: presence of chemical, physical, biological elements or agents which adversely affect human health and welfare; unfavourably alter ecological balances of importance to human life; aff...

AI summary This section defines environmental pollution and damage as the presence of harmful elements affecting human health, ecological balance, and the environment. It also defines environmental protection as the prevention or control of pollution and habitat disruption during construction.

1.4 ACTION AND INFORMATIONAL SUBMITTALS p. p. 3
1.4 ACTION AND INFORMATIONAL SUBMITTALS - .1 Product Data: - .1 Submit one copy of WHMIS SDS in accordance with Section 01 35 29.06 - Health and Safety. - .2 Before commencing construction activities or delivery of materials to site, submi...

AI summary The document outlines requirements for submitting various environmental protection plans and data before construction activities begin, including the WHMIS SDS, Environmental Protection Plan, Erosion and Sediment Control Plan, and Spill Control Plan, among others, to ensure compliance with health, safety, and environmental regulations.

1.6 DRAINAGE p. p. 3
1.6 DRAINAGE - .1 Develop and submit ESC Plan identifying type and location of erosion and sediment controls provided. Plan to include monitoring and reporting requirements to assure that control measures are in compliance with ESC Plan, F...

AI summary The section outlines requirements for erosion and sediment control (ESC) plans and storm water pollution prevention plans (SWPPP), including monitoring, compliance with regulations, and proper drainage and pumping practices to prevent contamination of waterways and ensure regulatory compliance.

1.7 MONITORING p. p. 3
1.7 MONITORING .1 The water inlet point to the existing Lagoon will be the compliance monitoring point for water discharged from the Works. The regulatory limit for supended solids discharged from the Lagoon is 25 mg/L for a monthly averag...

AI summary The water inlet point to the existing Lagoon serves as the compliance monitoring point for discharged water. Regulatory limits for suspended solids are set at 25 mg/L for a monthly average and 50 mg/L for any single grab sample. The Contractor is responsible for ensuring compliance with these limits.

1.8 FLOCCULATION p. p. 3
1.8 FLOCCULATION .1 The Contractor shall be responsible to complete flocculation in the Lagoon as necessary. The methods for completing such flocculation should be included in the Contractor's Environmental Protection Plan and will be requ...

AI summary The Contractor is responsible for completing flocculation in the Lagoon as required, ensuring compliance with the Contract Documents and regulatory standards. The regulatory limit for suspended solids is 25 mg/L for a monthly average and 50 mg/L for a single grab sample.

3.1 TEMPORARY EROSION AND SEDIMENTATION CONTROL p. p. 3
3.1 TEMPORARY EROSION AND SEDIMENTATION CONTROL - .1 Provide temporary erosion and sedimentation control measures to prevent soil erosion and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways, acco...

AI summary The text outlines requirements for temporary erosion and sedimentation control measures during construction, including compliance with EPA standards, inspection and maintenance protocols, and post-removal restoration procedures.

3.1 TEMPORARY EROSION AND SEDIMENTATION CONTROL p. p. 3
3.1 TEMPORARY EROSION AND SEDIMENTATION CONTROL - .1 Provide temporary erosion and sedimentation control measures to prevent soil erosion and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways, acco...

AI summary The text outlines requirements for temporary erosion and sedimentation control measures during construction, including compliance with EPA standards, inspection and maintenance protocols, and post-removal restoration procedures.

3.1 TEMPORARY EROSION AND SEDIMENTATION CONTROL p. p. 3
3.1 TEMPORARY EROSION AND SEDIMENTATION CONTROL - .1 Provide temporary erosion and sedimentation control measures to prevent soil erosion and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways, acco...

AI summary The text outlines requirements for temporary erosion and sedimentation control measures during construction, including compliance with EPA standards, inspection and maintenance of controls, and restoration after removal.

3.1 TEMPORARY EROSION AND SEDIMENTATION CONTROL p. p. 3
3.1 TEMPORARY EROSION AND SEDIMENTATION CONTROL - .1 Provide temporary erosion and sedimentation control measures to prevent soil erosion and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways, acco...

AI summary This section outlines requirements for temporary erosion and sedimentation control measures during construction, including compliance with specific standards, inspection and maintenance protocols, and post-removal restoration procedures.

3.3 CLEANING p. p. 3
3.3 CLEANING .1 Remove construction debris from Project Site and dispose of debris in an environmentally responsible and legal manner.

AI summary The text specifies that construction debris must be removed from the Project Site and disposed of in an environmentally responsible and legal manner.

• Environmental Considerations: p. p. 126
• Environmental Considerations: Overview of environmental regulations and permits relevant to the handling, storage, and reclamation of CFB residue. This section is also intended to establish protocols for planned inspection and sampling o...

AI summary This section outlines environmental regulations and permits related to the handling, storage, and reclamation of CFB residue, and establishes protocols for inspection and sampling at the Point Aconi site to support the Ash Diversion project.

3.4 Ponds p. pp. 137-139
3.4 Ponds Surface runoff and leachate overflow from the storage tanks are accommodated in surface runoff control ponds on the residue management site. Figure 6 shows the location of the ponds described in this sub-section. Figure 6: Point...

AI summary The document describes the design and operation of surface runoff control ponds at the Point Aconi CFB Residue Management Site, including Pond 7A and Pond 7B, their construction details, water management functions, and compliance measures.

• Equipment Servicing and Refuelling: p. pp. 142-143
• Equipment Servicing and Refuelling: Minor mobile equipment servicing, and repair is completed on-site. If equipment is to be refuelled on site, the Contractor will be responsible for providing the required environmental protection measur...

AI summary The document outlines procedures for on-site servicing and refuelling of minor mobile equipment, emphasizing environmental protection measures such as spill prevention and clean-up. It references the Residue Management Operations Manual from July 2021.

4.9 Ash Reclamation p. p. 151
4.9 Ash Reclamation Ash recovery from uncapped cells for offsite use may occur. This will require excavation of existing ash and trucking to an offsite location. Capping material will be removed as needed. Ash will normally contain 10-20%...

AI summary The document outlines the process for ash reclamation from uncapped cells for offsite use, including moisture management, dust control, and transportation requirements to ensure compliance with environmental and safety standards.

4.12.3 Dust Control p. pp. 153-154
4.12.3 Dust Control The control of fugitive dusting at the landfill site is a matter of prime importance. Total Suspended Particulate (TSP) limits at the NSPI property boundary have been set by the Operating Approval stipulations and are a...

AI summary The document outlines dust control measures at the NSPI landfill site, including TSP limits, the use of a Hi-Vol air sampler, water trucks for dust suppression, and procedures for inspections and cleanup. The measures are part of the operations at Point Aconi and require compliance with environmental regulations.

4.12.4 Noise Control p. p. 154
4.12.4 Noise Control All vehicles working at, and travelling to, the landfill site must be fitted with standard muffling devices. Muffling devices must be repaired or replaced as necessary to maintain their effectiveness. The natural veget...

AI summary The document outlines noise control measures at the landfill site, requiring vehicles to have muffling devices and maintaining vegetation buffers to reduce noise. Tree removal in buffer zones requires NSPI approval.

p. p. 156
Title: Point Aconi Generating Station CFB Residue Management Operations Manual 5.3 Discharged Water Quality Objectives

AI summary This section outlines the discharged water quality objectives for the Point Aconi Generating Station CFB Residue Management Operations Manual, focusing on environmental standards and management practices.

• Active Ash Disposal Area: p. pp. 162-178
• Active Ash Disposal Area: - The active site should be evaluated for contamination, debris, and proper and complete compaction. - Covering of placed ash will be checked to confirm adequate coverage and the minimization of exposed ash.

AI summary The active ash disposal area requires evaluation for contamination, debris, and compaction, with checks to ensure proper coverage and minimize exposed ash.

6.10.2 Water Compliance p. p. 166
6.10.2 Water Compliance The compliance point for ocean discharge of surplus water from Pond 7A will be at the plant WWTP or at the CW Outfall. Residue contacted water is pumped to the Wastewater Treatment Plant (WWTP) for batch treatment o...

AI summary The document outlines water compliance measures for surplus water discharge from Pond 7A, including monitoring at the WWTP and CW Outfall, emergency overflow procedures, and monitoring well assessments. It also specifies groundwater sampling protocols under the supervision of a Site Professional.

6.11.2 Reporting p. p. 167
6.11.2 Reporting Annual reports will be provided to NSE, by March 31st of each year. Requirements of the annual reports are summarized in the current operating approval. Spills or releases will be reported to Nova Scotia Environment in acc...

AI summary Annual reports must be submitted to Nova Scotia Environment by March 31st each year. Spills or releases must be reported and cleaned up in accordance with the Nova Scotia Environment Act and related regulations.

7.3 Reclamation Strategy p. pp. 168-169
7.3 Reclamation Strategy Ash placement in the Point Aconi CFB Residue Management Site is intended to be done by the Ash Contractor knowing reclamation is to follow. It should be recognized that ash reclamation poses risk to environment and...

AI summary The reclamation strategy for the Point Aconi CFB Residue Management Site outlines procedures to manage ash placement and reclamation, emphasizing environmental and health safety. It includes measures to prevent contamination, control dusting and leaching, and ensure proper site management during and after ash removal.

• Natural Considerations: p. p. 178
• Natural Considerations: - The ash site will be checked for signs of the presence of wildlife. - Vegetation concerns (i.e. presence of saplings on berms, in ditches, interference with road access/visibility) will be evaluated.

AI summary The text discusses natural considerations related to a project, including checking for wildlife presence at an ash site and evaluating vegetation concerns such as saplings on berms and in ditches, as well as their impact on road access and visibility.

p. p. 184
1 Request IR-4: 9 (a) Please describe the work involved to verify that surface runoff water quality meets 10 applicable discharge criteria. 11 12 (b) Please describe the work involved to direct runoff away from the wastewater 13 collection...

AI summary The text outlines a regulatory request (IR-4) related to verifying surface runoff water quality and managing runoff from the Point Aconi Generating Station. It references an Industrial Approval (IA) to Operate and mentions the submission of confirmatory samples to a third-party laboratory for analysis to ensure compliance with discharge criteria.

99032Board Decision Letter 1 passage
M12371 – Nova Scotia Power Inc. – CI C0061005 – POA Cell Capping 2025 – $2,530,405 p. pp. 0-1
M12371 – Nova Scotia Power Inc. – CI C0061005 – POA Cell Capping 2025 – $2,530,405 The Board has reviewed the application by Nova Scotia Power Inc. (NS Power) dated July 7, 2025. NS Power requested Board approval of a capital expenditure i...

AI summary Nova Scotia Power Inc. (NS Power) requested approval for a $2,530,405 capital expenditure to cap Ash Disposal Cell 2 at the Point Aconi Residue Management Site. The Board reviewed the application and found the work necessary and the cost justified. The expenditure will be included in the company's Decarbonization Deferral Account.

98615NSEB (NSPI) IR-1 to IR-11 1 passage
Request IR-2:
Request IR-2: Please provide a copy of the PA Generating Station's approved industrial permit issued by the NS Department of Environment and Climate Change (Department).

AI summary Request IR-2 asks for a copy of the approved industrial permit for the PA Generating Station issued by the NS Department of Environment and Climate Change.

99032Board Decision Letter 1 passage
M12371 – Nova Scotia Power Inc. – CI C0061005 – POA Cell Capping 2025 – $2,530,405 p. pp. 0-1
M12371 – Nova Scotia Power Inc. – CI C0061005 – POA Cell Capping 2025 – $2,530,405 The Board has reviewed the application by Nova Scotia Power Inc. (NS Power) dated July 7, 2025. NS Power requested Board approval of a capital expenditure i...

AI summary The Board has approved a $2,530,405 capital expenditure request by Nova Scotia Power Inc. for capping Ash Disposal Cell 2 at the Point Aconi Residue Management Site, in accordance with the Environment Act. The project includes constructing an interceptor ditch to manage water and is part of the company's Decarbonization Deferral Account.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →