Matter: CI# 38942 - P-128.10 - NSPI WO - TUC-Unit #3 Generator Rotor Rewind - $1,798,080
2 passages 1 document

Generator Interconnection across all matters →

N-1Redacted Work Order 9/2/2010 2 passages
Section 28 p. p. 1
CI Number 38942 - TUC - Unit # 3 Generator Rotor Rewind Parent CI Number Cost Centre 319 - 319-TC Unit 3 Capital Budget Version - 201007/05 Forecast Forecast Start Operational 08/01/2010 11/30/2010 2010 $1,798,079.52 12/30/2010 Final Cost...

AI summary This document details a capital project related to the rewinding of Unit #3 generator rotor at Cost Centre 319, initiated due to displaced coil insulating barriers discovered during an unplanned bus duct replacement project in 2009. The rewinding is necessary to prevent potential short circuits and unplanned outages.

Section 30 p. p. 1
TUC #3 GENERATOR ROTOR REWIND Project Number Approved Date Parent CI Number Cost Centre 319 319-TC Unit 3 Capital Capital Item Justification Justification Criteria: THERMAL Sub-Criteria: Maintenance Name of Report : Document Location : Per...

AI summary The TUC #3 Generator Rotor Rewind project is being undertaken to replace insulating barriers and prevent an extended unplanned outage. The project was identified during a 2009 inspection and is being carried out now due to the availability of lower costs from rotor service shops. The project is being done through a full rotor rewind rather than replacing the generator due to cost considerations.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →