Topic/Matter Intersection

Topic:"Generator Interconnection" in M12374

Matter: Nova Scotia Power Inc. - CI C0017098 – Ragged Lake Generator Replacement - $1,681,714 (FIN)
2 passages 2 documents

Generator Interconnection across all matters →

N-1Application 1 passage
DESCRIPTION: p. p. 1
DESCRIPTION: The NS Power Control Centre is critical for the safe and reliable operation of the Nova Scotia electrical system and is essential for the operation of the NS Power generation fleet, operation of the interconnections to New Bru...

AI summary The NS Power Control Centre is vital for grid operations and is currently supplied by a 32-year-old electrical system that requires replacement. The project involves upgrading generators, switchgear, and other infrastructure to ensure reliable backup power. The asset is classified under General Plant – Buildings Structures and Grounds with an estimated life of 30 years.

98426Letter NSPI re: Capital Items Filed Outside the Quarter Package 1 passage
Final Cost (FIN) Capital Items p. p. 0
Final Cost (FIN) Capital Items • CI C0017098 – Ragged Lake Generator Replacement - $1,681,714 Original approval received on October 19, 2020 for $2,229,267 Decreased spend amount $547,553 Non-Confidential

AI summary The Final Cost (FIN) Capital Items section lists the Ragged Lake Generator Replacement project, which was originally approved for $2,229,267 but has a decreased spend amount of $547,553, with the final cost being $1,681,714.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →