Matter: Nova Scotia Power Inc. - CI C0070486 – HYD Lower Great Brook Stoplog Replacement – $3,593,884
2 passages 1 document

Generator Interconnection across all matters →

N-2NSPI (NSEB) RIR 1 to 3 - Redacted 2 passages
NON-CONFIDENTIAL p. p. 3
NON-CONFIDENTIAL 1 Request IR-1: 27 (d) NS Power submitted its application at the earliest feasible time. The November 2024 28 inspection identified that the stoplogs required replacement. At that time, NS Power and 29 its consultant began...

AI summary NS Power submitted an application for a project following an inspection in November 2024 that identified the need to replace stoplogs. Preliminary engineering and planning were undertaken to prepare the application for the NSEB.

Project Estimate p. pp. 61-67
Project Estimate April 15, 2025 Reference 801-041525 NSPI Mersey River - Lower Great Brook Dam Coring Nova Scotia Power Mersey River, NS Attention: Roberts, Jacob Subject Lower Great Brook Dam Coring Tacten is pleased to have this opportun...

AI summary Nova Scotia Power has requested Tacten to retrieve 8 concrete core samples from the Lower Great Brook Dam on the Mersey River Hydro System near Milton, NS, and deliver them to WS Langley's lab in Dartmouth, NS.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →