Matter: Nova Scotia Power inc. - CI C0080150 – TUC1 HP Turbine Refurbishment - $2,527,606 (U&U)2026 Q1 Capital Reports
2 passages 2 documents

Generator Interconnection across all matters →

N-1CI C0080150 – TUC1 HP Turbine Refurbishment - $2,527,606 - Redacted 1 passage
Preamble p. p. 6
Plant/Unit: TUFTS COVE-1 The scope of work for this outage was to disassemble, clean, inspect and reassemble the HP turbine. Major milestones for the disassembly of this unit include: removal of the HP cylinders, removal of the HP rotor, r...

AI summary This document outlines the scope of work for a planned outage at TUFTS COVE-1, focusing on the disassembly, inspection, and reassembly of the high-pressure (HP) turbine. It details major milestones and components requiring replacement due to wear and damage.

102189Decision Letter 1 passage
Section 2 p. p. 0
ding grit blasting, dynamically balancing, and testing to address mechanical issues. NS Power stated that following the refurbishment, the unit operated normally, and turbine vibration was eliminated. NS Power stated that the decision to p...

AI summary NS Power conducted a U&U project to address turbine reliability and safety concerns, eliminating vibration and preventing potential outages. The scope was adjusted mid-project, excluding some inspections due to alignment satisfaction and delayed valve replacements. The repair was performed during a planned outage to avoid downtime.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →