HomeGrid ModernizationM12726Evidence
Topic/Matter Intersection

Topic:"Grid Modernization" in M12726

Matter: NSPI DRO Appeal - Billing Issues - Shaun Campbell
6 passages 5 documents

Grid Modernization across all matters →

C-1Notice of Appeal (redacted) 1 passage
Requested Outcome p. p. 0
Requested Outcome We respectfully request that the Board: - 1. Conduct a full review of the billing periods, meter reads, and occupancy timeline for both service addresses. - 2. Determine whether the September 16, 2025 actual read included...

AI summary The applicant requests the Board to review billing accuracy, meter reads, and occupancy timelines for two service addresses, assess discrepancies in kWh usage, verify bill accuracy, and determine if adjustments or a Measurement Canada test are required.

C-5Meter Test Results 1 passage
p. p. 1
Electric Meter Test Results - Screen Two - MTR02 - NOVA SCOTIA POWER IN — X File Edit Functions Help Electric Meter Test Results - Screen Two Equip Type MTRE Date 2026/01/13 17 Equip ID 2513903 Op Code TEST FLSASFKWH +0.08 FLSASFKQH FLAASF...

AI summary The document contains electric meter test results from multiple screens, including test dates, equipment details, and various test parameters. It shows data related to a meter with ID 2513903 tested by Nova Scotia Power Inc. on January 13, 2026, with some test results indicating values like +0.08 and +0.01 for different parameters.

C-10NSPI (NSEB) RIR-1 to RIR-10 - Redacted 2 passages
CONFIDENTIAL (Attachment Only)
CONFIDENTIAL (Attachment Only) 1 Request IR-01: 2 3 NS Power connected Mr. Campbell's service at this address on August 1, 2024. 4 5 (a) What kind of meter did the apartment have at the time of connection? 6 7 (b) When was this meter insta...

AI summary NS Power connected Mr. Campbell's service on August 1, 2024, with a standard AMI meter installed on November 28, 2023. The meter has not been tested since installation, and previous bills are provided in a confidential attachment.

Campbell DRO Appeal (NSEB M12726) NSPI Responses to NSEB Information Requests
Campbell DRO Appeal (NSEB M12726) NSPI Responses to NSEB Information Requests 1 Request IR-05: 2 3 NS Power connected Mr. Campbell's service at this address on May 30, 2025. NS Power 4 provided the work order that showed its field represen...

AI summary The document outlines Nova Scotia Power Inc.'s responses to information requests related to the connection of Mr. Campbell's service, including details about the meter type, installation date, and the 'Connect Remote' fee. It also addresses the process of service connection and the absence of automatic payment arrangements.

101720NSEB (NSPI) IR-1 to IR-10 (redacted) 1 passage
Request IR-1:
Request IR-1: NS Power connected Mr. Campbell's service at this address on August 1, 2024. - (a) What kind of meter did the apartment have at the time of connection? - (b) When was this meter installed in the building? - (c) Has this meter...

AI summary Request IR-1 seeks information about NS Power's service connection to Mr. Campbell's address, including meter details, installation dates, testing history, and billing records prior to March 2025.

102738Board Decision (redacted) 1 passage
METER READING p. p. 1
METER READING When reasonably possible, meters shall be read bi-monthly; however, the Company may read meters on a monthly basis. ..

AI summary The document specifies that meters should be read bi-monthly when reasonably possible, though the Company may opt for monthly readings.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →