HomeGrid ModernizationM12840Evidence
Topic/Matter Intersection

Topic:"Grid Modernization" in M12840

Matter: Nova Scotia Power inc. - CI C0080150 – TUC1 HP Turbine Refurbishment - $2,527,606 (U&U)2026 Q1 Capital Reports
1 passage 1 document

Grid Modernization across all matters →

N-1CI C0080150 – TUC1 HP Turbine Refurbishment - $2,527,606 - Redacted 1 passage
Preamble p. p. 6
Plant/Unit: TUFTS COVE-1 Siemens Energy Limited provided technical field advisors required to complete the work scope. The work schedule was two 10-hour shifts per day, 6 days a week. This schedule was maintained throughout the outage. The...

AI summary The outage at TUFTS COVE-1 involved Siemens Energy Limited providing technical field advisors, with labor provided by Nova Scotia Power and Fundy millwrights. The work schedule was two 10-hour shifts per day, six days a week, maintained throughout the outage.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →