HomeGrid ModernizationM12846Evidence
Topic/Matter Intersection

Topic:"Grid Modernization" in M12846

Matter: NSPI DRO Appeal - Billing Issues - Lora Trachsel
5 passages 4 documents

Grid Modernization across all matters →

T-4Appellants Meter Readings and Results (redacted) 1 passage
p. p. 10
Electric Meter Test Results• Screen Two t Equip Type MTRE I 2025111119 Jgl Date Equip ID 2283287 +- l ITEST Op Code FLSASFKWH l•0.07 FLSASFKQH FLAASFKWH 11 FLAASFKQH FLCASFKWH I FLCASFKQH I FLBASFKWH FLBASFKQH l•0.09 LLSASFKWH LLSASFKQH I...

AI summary The document contains electric meter test results for an equipment with ID 2283287, including various test parameters, replacement details, and operational codes. The tests were conducted on November 19, 2025, and involved multiple components such as creep tests, dial checks, and phase tests.

T-5NSPI Response to Appeal (redacted) 1 passage
REDACTED Trachsel DRO Appeal Attachment 4 Page 3 of 6 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 11
REDACTED Trachsel DRO Appeal Attachment 4 Page 3 of 6 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Electric Meter Test Results - Screen One - MTR01 - File Edit Functions Help NOVA SCOTIA POWER IN - × Electric Meter Test Results - Screen One...

AI summary The text contains redacted pages from a DRO appeal attachment related to electric meter test results. It includes various screens and data related to the testing of an electric meter with specific equipment details, test dates, and replacement actions taken.

T-7NSPI (NSEB) RIR-1 to RIR-4 (redacted) 2 passages
REDACTED p. p. 2
REDACTED 1 Request IR-1: 2 3 On May 20, 2026, NS Power provided Ms. Trachsel's Account Usage Info in Attachment 1 4 that shows the first bill dated October 15, 2020, for while her Statement of 5 Account in the same Attachment 1 only went b...

AI summary The document outlines information requests related to Ms. Trachsel's account with NS Power, including the start date of her account, meter details, installation dates, and testing history. It also references a DRO appeal (NSEB M12846) and NSPI's responses to information requests.

NON-CONFIDENTIAL p. p. 2
NON-CONFIDENTIAL 1 (e) The customer has opted out of over-the-air meter reading and the read service order was 2 not fulfilled due to there not being enough time to complete the reading on the day the read 3 service order was assigned.

AI summary The customer opted out of over-the-air meter reading, and the read service order was not completed due to insufficient time on the day it was assigned.

T-10NSPI (NSEB) RIR-5 - redacted 1 passage
CONFIDENTIAL (ATTACHMENT ONLY)
CONFIDENTIAL (ATTACHMENT ONLY) 1 The meter read was not done over the air because the customer had opted out of the smart 2 meter program and the Radio Frequency (RF) was turned off for this meter, eliminating 3 the wireless communication...

AI summary The document discusses a situation where a meter read was not done remotely due to the customer opting out of the smart meter program. It also mentions safety concerns related to unsecured dogs preventing meter readers from accessing the property. A new bill was generated based on a meter read taken on August 26, 2026.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →