HomeGrid ModernizationM12947Evidence
Topic/Matter Intersection

Topic:"Grid Modernization" in M12947

Matter: NSPI DRO Appeal - Meter and Power Consumption - Bernard Wentzell
4 passages 2 documents

Grid Modernization across all matters →

W-5Appellants Billing Information (redacted) 3 passages
N.S POWER INDICATED CONSUMPTION BILLING PURIOD JAN 24th - MAR 24th p. p. 1
N.S POWER INDICATED CONSUMPTION BILLING PURIOD JAN 24th - MAR 24th 2/25/2026 0:00 No AMI Read Available 2/24/2026 0:00 No AMI Read Available 2/23/2026 0:00 2194.144 kWh Consumption 2/22/2026 0:00 2192.143 80.04 kWh Consumption 2/21/2026 0:...

AI summary The document presents a billing period for N.S. Power from January 24th to March 24th, 2026, showing indicated consumption readings for a specific account. The table lists consumption data, with some dates marked as 'No AMI Read Available.'

N'S POWER INDICATED CONSUMPTION BILLING PERIOD JAN 24H - MAR 24H p. p. 1
N'S POWER INDICATED CONSUMPTION BILLING PERIOD JAN 24H - MAR 24H - C 2010 3/30/2026 0:00 _ No AMI Read Available

AI summary The document indicates that there was no available AMI read for the billing period from January 24th to March 24th, with the date of the entry being March 30th, 2026.

BILLING RERIUD JAN 24th - MAR 24th p. p. 1
2/25/2026 0:00 17.1 No AMI Read Available

AI summary On February 25, 2026, there was no available AMI read, which may impact billing processes and data collection for the period of January 24th to March 24th.

W-8Appellant's Response to NSPI - Redacted 1 passage
N,S POWER INDICATED SOLAR BENERATION
N,S POWER INDICATED SOLAR BENERATION Read Date Motor Dood Motor Haara Dand Time 3/14/2026 0:00 1124.252 kWh Generation /5,9 3/13/2026 0:00 1123.293 38.36 kWh Generation 57.4 3/12/2026 0:00 1123.266 1.08 kWh Generation //./ 3/11/2026 0:00 1...

AI summary The document presents a table of solar generation data for a specific period, including read dates, motor values, and generation metrics. Some entries indicate missing or unavailable data, likely due to issues with the AMI (Advanced Metering Infrastructure) system.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →