2 2024 Load Forecast Report (NSUARB M11689) NSPI Responses to CA Information Requests NON-CONFIDENTIAL

AI summary The 2024 Load Forecast Report (NSUARB M11689) outlines NSPI's responses to information requests by the Canadian Association (CA). The report addresses energy usage projections and regulatory compliance matters under NSUARB oversight.

N-4NSPI (NSUARB) RIR-1 to RIR-26 1 passage
Section 22
2024 Load Forecast Report (NSUARB M11689) NSPI Responses to NSUARB Information Requests NON-CONFIDENTIAL

AI summary The 2024 Load Forecast Report (NSUARB M11689) details NSPI's responses to NSUARB information requests. The document is marked non-confidential and relates to regulatory proceedings involving load forecasting and utility information disclosure.

N-5NSPI (SBA) RIR-1 to RIR-10 1 passage
Section 1
2024 Load Forecast Report (NSUARB M11689) NSPI Responses to SBA Information Requests NON-CONFIDENTIAL 1 Request IR-1: 2 3 Please provide workpapers, with formula intact, in Excel format, for all Figures/Charts 4 presented in the load forec...

AI summary NSPI responds to SBA's information requests regarding the 2024 Load Forecast Report, clarifying that SGNS project assets (other than EV charging and batteries) are not direct inputs to the forecast. Workpapers are referred to Synapse IR-01, and SGNS is described as a pilot project for grid control evaluation.

N-6NSPI (Synapse) RIR-1 to RIR-54 - Redacted 1 passage
Section 1
REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2024 Load Forecast Report (NSUARB M11689) NSPI Responses to Synapse Information Requests NON-CONFIDENTIAL 1 Request IR-1: 2 3 Report Tables 4 5 (a) Please provide in electronic spreadsheet format...

AI summary The document outlines NSPI's response to Synapse's information requests regarding the 2024 Load Forecast Report, specifying locations of figures in various attachments. It includes references to multiple Synapse IR attachments and the 2024 LFR Attachment 4.

93959Confidential Undertaking 1 passage
Section 2
Schedule “A” 1. NS Power will provide Designated Confidential Information, as defined herein, to the Designated Recipient as defined in the undertaking to which this schedule is attached. 2. Designated Confidential Information shall consis...

AI summary NS Power will provide Designated Confidential Information to the Designated Recipient, including specific sections from the 2024 Load Forecast Report and attachments, which are deemed confidential and subject to confirmation by the Nova Scotia Utility and Review Board.

94285BCC-Synapse (NSPI) IR-1 to IR-54 1 passage
Section 39
ta and the calculations used to produce the values in 33 Figure 53. 34 b. Please provide the source data and the calculations used to produce the values in 35 Figures 54 and 55.

AI summary The text requests the source data and calculations used to generate values in Figures 53, 54, and 55. It emphasizes transparency in methodology and data origins for specific visual representations in the proceeding document.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →