Matter: Nova Scotia Power inc. - CI C0080150 – TUC1 HP Turbine Refurbishment - $2,527,606 (U&U)2026 Q1 Capital Reports
3 passages 2 documents

Infrastructure Planning across all matters →

N-1CI C0080150 – TUC1 HP Turbine Refurbishment - $2,527,606 - Redacted 2 passages
Document No: XXX-XX-XXXX-XXXX p. p. 6
Document No: XXX-XX-XXXX-XXXX Project Cost Estimate Input Checklist and Maturity Matrix Process Industries Required fields: Estimate Classification Project Name: TUC1 HP Turbine Refurbishment Started or Preliminary Class 5 Class 4 Class 3...

AI summary This document outlines a checklist and maturity matrix for estimating project costs related to the TUC1 HP Turbine Refurbishment. It includes sections such as project scope, capacity, location, requirements, technology selection, strategy, and planning, with varying levels of definition and completeness.

2.4.1 Photo Attachments p. pp. 14-17
2.4.1 Photo Attachments 2.4.1.1 Bearing #1 2.4.1.2 Bearing #2 Lower Half Plant/Unit: TUFTS COVE-1 2.4.1.3 Bearing #2 Upper Half 2.4.1.4 Bearing #3 Upper Half 2.4.1.5 Bearing #2 Thrust Pads 2.4.1.6 Bearing #2 Thrust Pads

AI summary Section 2.4.1 includes photo attachments of bearings (1, 2, 3) from TUFTS COVE-1 power plant unit, with specific references to lower/upper halves and thrust pads. Images are labeled with technical identifiers but lack textual analysis or discussion.

101857Letter NSPI re:First Quarter 2026 Capital Items 1 passage
Planned & Advanced (P&A) Capital Items p. p. 0
Planned & Advanced (P&A) Capital Items • CI C0044172 – L7005 Canso Crossing Vibration Mitigation - $2,431,095 $2,431,095 spent as at December 31, 2025 Partially Confidential

AI summary The document lists a completed capital project (CI C0044172) for Canso Crossing vibration mitigation, with full expenditure of $2,431,095 as of December 31, 2025, marked as partially confidential.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →